Serveur d'exploration sur l'opéra

Attention, ce site est en cours de développement !
Attention, site généré par des moyens informatiques à partir de corpus bruts.
Les informations ne sont donc pas validées.

Preservation, people, and politics in the restoration of the National Theatre of Panama : a case study

Identifieur interne : 001B53 ( Main/Exploration ); précédent : 001B52; suivant : 001B54

Preservation, people, and politics in the restoration of the National Theatre of Panama : a case study

Auteurs : A. Rajer [États-Unis]

Source :

RBID : Pascal:06-0130262

Descripteurs français

English descriptors

Abstract

This paper describes the complex international aspects of the recent restoration of the National Theatre of Panama and the technical, political, and aesthetic compromises that occurred in order to restore the building to working condition. Located on the shores of the Pacific Ocean in the old quarter of Panama City, the National Theatre is an Italian opera house built between 1905-08. Italian architect Gennaro Nicola Ruggieri designed the building to emulate great Italian opera houses such as LaScala in Milan. Panamanian artist Roberto Lewis was commissioned to paint the murals. In June 2000 a large section of the theatre's main ceiling mural collapsed during a ballet rehearsal. Fortunately, no one was killed. This prompted an evaluation of the structure and an urgent call for restoration and repair of the leaking roof. Emergency funds were donated from the German and American governments through the Panamanian Institute of Culture (INAC) and in 2002 just the ceiling was restored. The First Lady of the Panama took an interest in the theatre's poor condition and secured funding from the government of Taiwan, with additional donations from the government of Japan for a complete restoration. Architects prepared a study of the building's condition and a five million dollar construction budget. Conservators were hired to restore the painted decoration. Work began in June 2002, and it was to conclude on Panama's centennial on November 3, 2003. However, because of numerous bureaucratic problems the work was not completed until August 2004. The conservation staff educated the public about the project through the media, web site, publications and guided tours. The technical aspects of the work included conservation of the art, and putting in a new stage, seats, lighting, air conditioning, and new dressing rooms. Nearly every problem was taken care of except a new roof, the cause of the mural collapse in the first place. Roof leaks had prompted restorations in 1941 and 1971-74. Now after nearly 100 years, the theatre is again awaiting a new roof and government action.


Affiliations:


Links toward previous steps (curation, corpus...)


Le document en format XML

<record>
<TEI>
<teiHeader>
<fileDesc>
<titleStmt>
<title xml:lang="en" level="a">Preservation, people, and politics in the restoration of the National Theatre of Panama : a case study</title>
<author>
<name sortKey="Rajer, A" sort="Rajer, A" uniqKey="Rajer A" first="A." last="Rajer">A. Rajer</name>
<affiliation wicri:level="1">
<inist:fA14 i1="01">
<s1>University of Wisconsin</s1>
<s3>USA</s3>
<sZ>1 aut.</sZ>
</inist:fA14>
<country>États-Unis</country>
<wicri:noRegion>University of Wisconsin</wicri:noRegion>
</affiliation>
</author>
</titleStmt>
<publicationStmt>
<idno type="wicri:source">INIST</idno>
<idno type="inist">06-0130262</idno>
<date when="2005">2005</date>
<idno type="stanalyst">PASCAL 06-0130262 INIST</idno>
<idno type="RBID">Pascal:06-0130262</idno>
<idno type="wicri:Area/PascalFrancis/Corpus">000377</idno>
<idno type="wicri:Area/PascalFrancis/Curation">000215</idno>
<idno type="wicri:Area/PascalFrancis/Checkpoint">000339</idno>
<idno type="wicri:Area/Main/Merge">001C00</idno>
<idno type="wicri:Area/Main/Curation">001B53</idno>
<idno type="wicri:Area/Main/Exploration">001B53</idno>
</publicationStmt>
<sourceDesc>
<biblStruct>
<analytic>
<title xml:lang="en" level="a">Preservation, people, and politics in the restoration of the National Theatre of Panama : a case study</title>
<author>
<name sortKey="Rajer, A" sort="Rajer, A" uniqKey="Rajer A" first="A." last="Rajer">A. Rajer</name>
<affiliation wicri:level="1">
<inist:fA14 i1="01">
<s1>University of Wisconsin</s1>
<s3>USA</s3>
<sZ>1 aut.</sZ>
</inist:fA14>
<country>États-Unis</country>
<wicri:noRegion>University of Wisconsin</wicri:noRegion>
</affiliation>
</author>
</analytic>
<series>
<title level="j" type="main">Transactions on the built environment</title>
</series>
</biblStruct>
</sourceDesc>
<seriesStmt>
<title level="j" type="main">Transactions on the built environment</title>
</seriesStmt>
</fileDesc>
<profileDesc>
<textClass>
<keywords scheme="KwdEn" xml:lang="en">
<term>Case history</term>
<term>Collapse</term>
<term>Historic preservation</term>
<term>International conference</term>
<term>Master plan</term>
<term>Panama</term>
<term>Policy</term>
<term>Preservation</term>
<term>Project evaluation</term>
<term>Restoration</term>
<term>Theatre</term>
<term>Theatre(building)</term>
</keywords>
<keywords scheme="Pascal" xml:lang="fr">
<term>Théâtre bâtiment</term>
<term>Sauvegarde patrimoine</term>
<term>Préservation</term>
<term>Restauration</term>
<term>Salle spectacle</term>
<term>Panama</term>
<term>Evaluation projet</term>
<term>Politique</term>
<term>Historique</term>
<term>Effondrement</term>
<term>Schéma directeur</term>
<term>Congrès international</term>
</keywords>
<keywords scheme="Wicri" type="geographic" xml:lang="fr">
<term>Panama</term>
</keywords>
<keywords scheme="Wicri" type="topic" xml:lang="fr">
<term>Politique</term>
<term>Historique</term>
</keywords>
</textClass>
</profileDesc>
</teiHeader>
<front>
<div type="abstract" xml:lang="en">This paper describes the complex international aspects of the recent restoration of the National Theatre of Panama and the technical, political, and aesthetic compromises that occurred in order to restore the building to working condition. Located on the shores of the Pacific Ocean in the old quarter of Panama City, the National Theatre is an Italian opera house built between 1905-08. Italian architect Gennaro Nicola Ruggieri designed the building to emulate great Italian opera houses such as LaScala in Milan. Panamanian artist Roberto Lewis was commissioned to paint the murals. In June 2000 a large section of the theatre's main ceiling mural collapsed during a ballet rehearsal. Fortunately, no one was killed. This prompted an evaluation of the structure and an urgent call for restoration and repair of the leaking roof. Emergency funds were donated from the German and American governments through the Panamanian Institute of Culture (INAC) and in 2002 just the ceiling was restored. The First Lady of the Panama took an interest in the theatre's poor condition and secured funding from the government of Taiwan, with additional donations from the government of Japan for a complete restoration. Architects prepared a study of the building's condition and a five million dollar construction budget. Conservators were hired to restore the painted decoration. Work began in June 2002, and it was to conclude on Panama's centennial on November 3, 2003. However, because of numerous bureaucratic problems the work was not completed until August 2004. The conservation staff educated the public about the project through the media, web site, publications and guided tours. The technical aspects of the work included conservation of the art, and putting in a new stage, seats, lighting, air conditioning, and new dressing rooms. Nearly every problem was taken care of except a new roof, the cause of the mural collapse in the first place. Roof leaks had prompted restorations in 1941 and 1971-74. Now after nearly 100 years, the theatre is again awaiting a new roof and government action.</div>
</front>
</TEI>
<affiliations>
<list>
<country>
<li>États-Unis</li>
</country>
</list>
<tree>
<country name="États-Unis">
<noRegion>
<name sortKey="Rajer, A" sort="Rajer, A" uniqKey="Rajer A" first="A." last="Rajer">A. Rajer</name>
</noRegion>
</country>
</tree>
</affiliations>
</record>

Pour manipuler ce document sous Unix (Dilib)

EXPLOR_STEP=$WICRI_ROOT/Wicri/Musique/explor/OperaV1/Data/Main/Exploration
HfdSelect -h $EXPLOR_STEP/biblio.hfd -nk 001B53 | SxmlIndent | more

Ou

HfdSelect -h $EXPLOR_AREA/Data/Main/Exploration/biblio.hfd -nk 001B53 | SxmlIndent | more

Pour mettre un lien sur cette page dans le réseau Wicri

{{Explor lien
   |wiki=    Wicri/Musique
   |area=    OperaV1
   |flux=    Main
   |étape=   Exploration
   |type=    RBID
   |clé=     Pascal:06-0130262
   |texte=   Preservation, people, and politics in the restoration of the National Theatre of Panama : a case study
}}

Wicri

This area was generated with Dilib version V0.6.21.
Data generation: Thu Apr 14 14:59:05 2016. Site generation: Thu Jan 4 23:09:23 2024