Production cost (ToSIA indicator)

From Wicri Forest
ToSIA indicators
Go to ToSIA indicators

Production cost is the 02 indicator in the ToSIA system.

Indicator's description: Average production cost (APC) and share of cost of wood-based materials.

Sub-indicators

  • APC total (€)
  • Share of cost of wood-based materials (% of APC)
Relations with FOREST EUROPE criteria
Relations with FOREST EUROPE indicators
No related FOREST EUROPE indicator

Related institutions

Related policy processes

No related policy process for this indicator

Related policy instruments

No related policy instrument for this indicator

Note