Update of geothermal energy development in Greece
Identifieur interne :
000059 ( PascalFrancis/Corpus );
précédent :
000058;
suivant :
000060
Update of geothermal energy development in Greece
Auteurs : N. KoutroupisSource :
-
Geothermics [ 0375-6505 ] ; 1992.
RBID : Pascal:93-0352464
Descripteurs français
- Pascal (Inist)
- Energie géothermique,
Grèce,
Puits eau,
Iles Egée Grèce,
Centrale électrique,
Usine pilote,
Puits réinjection,
Saumure,
Exploitation,
Perspective,
Hydrochimie,
Vapeur eau,
Gaz hydrogène sulfuré,
Ile Milos,
Ile Nisyros.
English descriptors
- KwdEn :
- Greece,
Greek Aegean Islands,
brines,
exploitation,
geothermal energy,
hydrochemistry,
hydrogen sulfide,
pilot plants,
possibilities,
power plants,
reinjection wells,
water vapor,
water wells.
Abstract
Following the completion of the Geothermal Reconnaissance Study in Greece and the successful drilling of seven deep geothermal wells in the Aegean islands of Milos and Nisyros, PPC started the first step towards geothermal development for electricity production as follows: A geothermal electric pilot plant of 2 MWe nominal capacity was installed on the Zephyria plain in Milos island (1985). During a nine month operation of the plant, problems connected with its long term operation were solved (hot reinjection of the high salinity brine, turbine washing etc). A feasibility study regarding exploitation of the Nisyros geothermal resources was completed and PPC connected Nisyros island electrically to Kos island via submarine cables
Notice en format standard (ISO 2709)
Pour connaître la documentation sur le format Inist Standard.
pA |
A01 | 01 | 1 | | @0 0375-6505 |
---|
A02 | 01 | | | @0 GTMCAT |
---|
A03 | | 1 | | @0 Geothermics |
---|
A05 | | | | @2 21 |
---|
A06 | | | | @2 5-6 |
---|
A08 | 01 | 1 | ENG | @1 Update of geothermal energy development in Greece |
---|
A11 | 01 | 1 | | @1 KOUTROUPIS (N.) |
---|
A12 | 01 | 1 | | @1 STEINGRIMSON (Benedikt) @9 ed. |
---|
A12 | 02 | 1 | | @1 ELIASSON (Einar Tjörvi) @9 ed. |
---|
A12 | 03 | 1 | | @1 LINDAL (Baldur) @9 ed. |
---|
A12 | 04 | 1 | | @1 PALMASON (Gudmundur) @9 ed. |
---|
A14 | 01 | | | @1 Public Power Corp. @2 106 80 Athens @3 GRC |
---|
A15 | 01 | | | @1 Orkustofnun @2 Reykjavik @3 ISL @Z 1 aut. @Z 2 aut. |
---|
A18 | 01 | 1 | | @1 Federation of Icelandic Industries @3 ISL @9 patr. |
---|
A18 | 02 | 1 | | @1 International Geothermal Association @3 INT @9 patr. |
---|
A20 | | | | @1 881-890 @7 5 |
---|
A21 | | | | @1 1992 |
---|
A23 | 01 | | | @0 ENG |
---|
A43 | 01 | | | @1 INIST @2 17178 @5 354000032888010280 |
---|
A44 | | | | @0 0000 |
---|
A45 | | | | @0 1 ref. |
---|
A47 | 01 | 1 | | @0 93-0352464 |
---|
A60 | | | | @1 P @2 C |
---|
A61 | | | | @0 A |
---|
A64 | | 1 | | @0 Geothermics |
---|
A66 | 01 | | | @0 USA |
---|
C01 | 01 | | ENG | @0 Following the completion of the Geothermal Reconnaissance Study in Greece and the successful drilling of seven deep geothermal wells in the Aegean islands of Milos and Nisyros, PPC started the first step towards geothermal development for electricity production as follows: A geothermal electric pilot plant of 2 MWe nominal capacity was installed on the Zephyria plain in Milos island (1985). During a nine month operation of the plant, problems connected with its long term operation were solved (hot reinjection of the high salinity brine, turbine washing etc). A feasibility study regarding exploitation of the Nisyros geothermal resources was completed and PPC connected Nisyros island electrically to Kos island via submarine cables |
---|
C02 | 01 | 2 | | @0 226B03 |
---|
C02 | 02 | X | | @0 001E01O03 |
---|
C03 | 01 | 2 | FRE | @0 Energie géothermique |
---|
C03 | 01 | 2 | ENG | @0 geothermal energy |
---|
C03 | 01 | 2 | SPA | @0 Energía geotérmica |
---|
C03 | 02 | 2 | FRE | @0 Grèce @2 NG |
---|
C03 | 02 | 2 | ENG | @0 Greece @2 NG |
---|
C03 | 02 | 2 | SPA | @0 Grecia @2 NG |
---|
C03 | 03 | 2 | FRE | @0 Puits eau |
---|
C03 | 03 | 2 | ENG | @0 water wells |
---|
C03 | 03 | 2 | SPA | @0 Pozo agua |
---|
C03 | 04 | 2 | FRE | @0 Iles Egée Grèce @2 NG |
---|
C03 | 04 | 2 | ENG | @0 Greek Aegean Islands @2 NG |
---|
C03 | 04 | 2 | SPA | @0 Islas Egeas Griegas @2 NG |
---|
C03 | 05 | 2 | FRE | @0 Centrale électrique |
---|
C03 | 05 | 2 | ENG | @0 power plants |
---|
C03 | 05 | 2 | SPA | @0 Central eléctrica |
---|
C03 | 06 | 2 | FRE | @0 Usine pilote |
---|
C03 | 06 | 2 | ENG | @0 pilot plants |
---|
C03 | 06 | 2 | SPA | @0 Planta piloto |
---|
C03 | 07 | 2 | FRE | @0 Puits réinjection |
---|
C03 | 07 | 2 | ENG | @0 reinjection wells |
---|
C03 | 07 | 2 | SPA | @0 Pozo reinyección |
---|
C03 | 08 | 2 | FRE | @0 Saumure |
---|
C03 | 08 | 2 | ENG | @0 brines |
---|
C03 | 08 | 2 | SPA | @0 Salmuera |
---|
C03 | 09 | 2 | FRE | @0 Exploitation |
---|
C03 | 09 | 2 | ENG | @0 exploitation |
---|
C03 | 09 | 2 | SPA | @0 Explotación |
---|
C03 | 10 | 2 | FRE | @0 Perspective |
---|
C03 | 10 | 2 | ENG | @0 possibilities |
---|
C03 | 10 | 2 | SPA | @0 Perspectiva |
---|
C03 | 11 | 2 | FRE | @0 Hydrochimie |
---|
C03 | 11 | 2 | ENG | @0 hydrochemistry |
---|
C03 | 11 | 2 | SPA | @0 Hidroquímica |
---|
C03 | 12 | 2 | FRE | @0 Vapeur eau |
---|
C03 | 12 | 2 | ENG | @0 water vapor |
---|
C03 | 12 | 2 | SPA | @0 Vapor agua |
---|
C03 | 13 | 2 | FRE | @0 Gaz hydrogène sulfuré |
---|
C03 | 13 | 2 | ENG | @0 hydrogen sulfide |
---|
C03 | 13 | 2 | SPA | @0 Gas sulfhídrico |
---|
C03 | 14 | 2 | FRE | @0 Ile Milos @4 INC |
---|
C03 | 15 | 2 | FRE | @0 Ile Nisyros @4 INC |
---|
C06 | | | | @0 ILS @0 TAS @0 ANS |
---|
C07 | 01 | 2 | FRE | @0 Europe @2 NG |
---|
C07 | 01 | 2 | ENG | @0 Europe @2 NG |
---|
C07 | 01 | 2 | SPA | @0 Europa @2 NG |
---|
C07 | 02 | 2 | FRE | @0 Roche chimique |
---|
C07 | 02 | 2 | ENG | @0 chemically precipitated rocks |
---|
C07 | 02 | 2 | SPA | @0 Roca química |
---|
C07 | 03 | 2 | FRE | @0 Roche sédimentaire |
---|
C07 | 03 | 2 | ENG | @0 sedimentary rocks |
---|
C07 | 03 | 2 | SPA | @0 Roca sedimentaria |
---|
N21 | | | | @1 132 |
---|
|
pR |
A30 | 01 | 1 | ENG | @1 Industrial uses of geothermal energy. International conference @3 Reykjavik ISL @4 1992-09-02 |
---|
|
Format Inist (serveur)
NO : | PASCAL 93-0352464 INIST |
ET : | Update of geothermal energy development in Greece |
AU : | KOUTROUPIS (N.); STEINGRIMSON (Benedikt); ELIASSON (Einar Tjörvi); LINDAL (Baldur); PALMASON (Gudmundur) |
AF : | Public Power Corp./106 80 Athens/Grèce; Orkustofnun/Reykjavik/Islande (1 aut., 2 aut.) |
DT : | Publication en série; Congrès; Niveau analytique |
SO : | Geothermics; ISSN 0375-6505; Coden GTMCAT; Etats-Unis; Da. 1992; Vol. 21; No. 5-6; Pp. 881-890; Bibl. 1 ref. |
LA : | Anglais |
EA : | Following the completion of the Geothermal Reconnaissance Study in Greece and the successful drilling of seven deep geothermal wells in the Aegean islands of Milos and Nisyros, PPC started the first step towards geothermal development for electricity production as follows: A geothermal electric pilot plant of 2 MWe nominal capacity was installed on the Zephyria plain in Milos island (1985). During a nine month operation of the plant, problems connected with its long term operation were solved (hot reinjection of the high salinity brine, turbine washing etc). A feasibility study regarding exploitation of the Nisyros geothermal resources was completed and PPC connected Nisyros island electrically to Kos island via submarine cables |
CC : | 226B03; 001E01O03 |
FD : | Energie géothermique; Grèce; Puits eau; Iles Egée Grèce; Centrale électrique; Usine pilote; Puits réinjection; Saumure; Exploitation; Perspective; Hydrochimie; Vapeur eau; Gaz hydrogène sulfuré; Ile Milos; Ile Nisyros |
FG : | Europe; Roche chimique; Roche sédimentaire |
ED : | geothermal energy; Greece; water wells; Greek Aegean Islands; power plants; pilot plants; reinjection wells; brines; exploitation; possibilities; hydrochemistry; water vapor; hydrogen sulfide |
EG : | Europe; chemically precipitated rocks; sedimentary rocks |
SD : | Energía geotérmica; Grecia; Pozo agua; Islas Egeas Griegas; Central eléctrica; Planta piloto; Pozo reinyección; Salmuera; Explotación; Perspectiva; Hidroquímica; Vapor agua; Gas sulfhídrico |
LO : | INIST-17178.354000032888010280 |
ID : | 93-0352464 |
Links to Exploration step
Pascal:93-0352464
Le document en format XML
<record><TEI><teiHeader><fileDesc><titleStmt><title xml:lang="en" level="a">Update of geothermal energy development in Greece</title>
<author><name sortKey="Koutroupis, N" sort="Koutroupis, N" uniqKey="Koutroupis N" first="N." last="Koutroupis">N. Koutroupis</name>
<affiliation><inist:fA14 i1="01"><s1>Public Power Corp.</s1>
<s2>106 80 Athens</s2>
<s3>GRC</s3>
</inist:fA14>
</affiliation>
</author>
</titleStmt>
<publicationStmt><idno type="wicri:source">INIST</idno>
<idno type="inist">93-0352464</idno>
<date when="1992">1992</date>
<idno type="stanalyst">PASCAL 93-0352464 INIST</idno>
<idno type="RBID">Pascal:93-0352464</idno>
<idno type="wicri:Area/PascalFrancis/Corpus">000059</idno>
</publicationStmt>
<sourceDesc><biblStruct><analytic><title xml:lang="en" level="a">Update of geothermal energy development in Greece</title>
<author><name sortKey="Koutroupis, N" sort="Koutroupis, N" uniqKey="Koutroupis N" first="N." last="Koutroupis">N. Koutroupis</name>
<affiliation><inist:fA14 i1="01"><s1>Public Power Corp.</s1>
<s2>106 80 Athens</s2>
<s3>GRC</s3>
</inist:fA14>
</affiliation>
</author>
</analytic>
<series><title level="j" type="main">Geothermics</title>
<title level="j" type="abbreviated">Geothermics</title>
<idno type="ISSN">0375-6505</idno>
<imprint><date when="1992">1992</date>
</imprint>
</series>
</biblStruct>
</sourceDesc>
<seriesStmt><title level="j" type="main">Geothermics</title>
<title level="j" type="abbreviated">Geothermics</title>
<idno type="ISSN">0375-6505</idno>
</seriesStmt>
</fileDesc>
<profileDesc><textClass><keywords scheme="KwdEn" xml:lang="en"><term>Greece</term>
<term>Greek Aegean Islands</term>
<term>brines</term>
<term>exploitation</term>
<term>geothermal energy</term>
<term>hydrochemistry</term>
<term>hydrogen sulfide</term>
<term>pilot plants</term>
<term>possibilities</term>
<term>power plants</term>
<term>reinjection wells</term>
<term>water vapor</term>
<term>water wells</term>
</keywords>
<keywords scheme="Pascal" xml:lang="fr"><term>Energie géothermique</term>
<term>Grèce</term>
<term>Puits eau</term>
<term>Iles Egée Grèce</term>
<term>Centrale électrique</term>
<term>Usine pilote</term>
<term>Puits réinjection</term>
<term>Saumure</term>
<term>Exploitation</term>
<term>Perspective</term>
<term>Hydrochimie</term>
<term>Vapeur eau</term>
<term>Gaz hydrogène sulfuré</term>
<term>Ile Milos</term>
<term>Ile Nisyros</term>
</keywords>
</textClass>
</profileDesc>
</teiHeader>
<front><div type="abstract" xml:lang="en">Following the completion of the Geothermal Reconnaissance Study in Greece and the successful drilling of seven deep geothermal wells in the Aegean islands of Milos and Nisyros, PPC started the first step towards geothermal development for electricity production as follows: A geothermal electric pilot plant of 2 MW<sub>e</sub>
nominal capacity was installed on the Zephyria plain in Milos island (1985). During a nine month operation of the plant, problems connected with its long term operation were solved (hot reinjection of the high salinity brine, turbine washing etc). A feasibility study regarding exploitation of the Nisyros geothermal resources was completed and PPC connected Nisyros island electrically to Kos island via submarine cables</div>
</front>
</TEI>
<inist><standard h6="B"><pA><fA01 i1="01" i2="1"><s0>0375-6505</s0>
</fA01>
<fA02 i1="01"><s0>GTMCAT</s0>
</fA02>
<fA03 i2="1"><s0>Geothermics</s0>
</fA03>
<fA06><s2>5-6</s2>
</fA06>
<fA08 i1="01" i2="1" l="ENG"><s1>Update of geothermal energy development in Greece</s1>
</fA08>
<fA11 i1="01" i2="1"><s1>KOUTROUPIS (N.)</s1>
</fA11>
<fA12 i1="01" i2="1"><s1>STEINGRIMSON (Benedikt)</s1>
<s9>ed.</s9>
</fA12>
<fA12 i1="02" i2="1"><s1>ELIASSON (Einar Tjörvi)</s1>
<s9>ed.</s9>
</fA12>
<fA12 i1="03" i2="1"><s1>LINDAL (Baldur)</s1>
<s9>ed.</s9>
</fA12>
<fA12 i1="04" i2="1"><s1>PALMASON (Gudmundur)</s1>
<s9>ed.</s9>
</fA12>
<fA14 i1="01"><s1>Public Power Corp.</s1>
<s2>106 80 Athens</s2>
<s3>GRC</s3>
</fA14>
<fA15 i1="01"><s1>Orkustofnun</s1>
<s2>Reykjavik</s2>
<s3>ISL</s3>
<sZ>1 aut.</sZ>
<sZ>2 aut.</sZ>
</fA15>
<fA18 i1="01" i2="1"><s1>Federation of Icelandic Industries</s1>
<s3>ISL</s3>
<s9>patr.</s9>
</fA18>
<fA18 i1="02" i2="1"><s1>International Geothermal Association</s1>
<s3>INT</s3>
<s9>patr.</s9>
</fA18>
<fA20><s1>881-890</s1>
<s7>5</s7>
</fA20>
<fA21><s1>1992</s1>
</fA21>
<fA23 i1="01"><s0>ENG</s0>
</fA23>
<fA43 i1="01"><s1>INIST</s1>
<s2>17178</s2>
<s5>354000032888010280</s5>
</fA43>
<fA44><s0>0000</s0>
</fA44>
<fA45><s0>1 ref.</s0>
</fA45>
<fA47 i1="01" i2="1"><s0>93-0352464</s0>
</fA47>
<fA60><s1>P</s1>
<s2>C</s2>
</fA60>
<fA64 i2="1"><s0>Geothermics</s0>
</fA64>
<fA66 i1="01"><s0>USA</s0>
</fA66>
<fC01 i1="01" l="ENG"><s0>Following the completion of the Geothermal Reconnaissance Study in Greece and the successful drilling of seven deep geothermal wells in the Aegean islands of Milos and Nisyros, PPC started the first step towards geothermal development for electricity production as follows: A geothermal electric pilot plant of 2 MW<sub>e</sub>
nominal capacity was installed on the Zephyria plain in Milos island (1985). During a nine month operation of the plant, problems connected with its long term operation were solved (hot reinjection of the high salinity brine, turbine washing etc). A feasibility study regarding exploitation of the Nisyros geothermal resources was completed and PPC connected Nisyros island electrically to Kos island via submarine cables</s0>
</fC01>
<fC02 i1="01" i2="2"><s0>226B03</s0>
</fC02>
<fC02 i1="02" i2="X"><s0>001E01O03</s0>
</fC02>
<fC03 i1="01" i2="2" l="FRE"><s0>Energie géothermique</s0>
</fC03>
<fC03 i1="01" i2="2" l="ENG"><s0>geothermal energy</s0>
</fC03>
<fC03 i1="01" i2="2" l="SPA"><s0>Energía geotérmica</s0>
</fC03>
<fC03 i1="02" i2="2" l="FRE"><s0>Grèce</s0>
<s2>NG</s2>
</fC03>
<fC03 i1="02" i2="2" l="ENG"><s0>Greece</s0>
<s2>NG</s2>
</fC03>
<fC03 i1="02" i2="2" l="SPA"><s0>Grecia</s0>
<s2>NG</s2>
</fC03>
<fC03 i1="03" i2="2" l="FRE"><s0>Puits eau</s0>
</fC03>
<fC03 i1="03" i2="2" l="ENG"><s0>water wells</s0>
</fC03>
<fC03 i1="03" i2="2" l="SPA"><s0>Pozo agua</s0>
</fC03>
<fC03 i1="04" i2="2" l="FRE"><s0>Iles Egée Grèce</s0>
<s2>NG</s2>
</fC03>
<fC03 i1="04" i2="2" l="ENG"><s0>Greek Aegean Islands</s0>
<s2>NG</s2>
</fC03>
<fC03 i1="04" i2="2" l="SPA"><s0>Islas Egeas Griegas</s0>
<s2>NG</s2>
</fC03>
<fC03 i1="05" i2="2" l="FRE"><s0>Centrale électrique</s0>
</fC03>
<fC03 i1="05" i2="2" l="ENG"><s0>power plants</s0>
</fC03>
<fC03 i1="05" i2="2" l="SPA"><s0>Central eléctrica</s0>
</fC03>
<fC03 i1="06" i2="2" l="FRE"><s0>Usine pilote</s0>
</fC03>
<fC03 i1="06" i2="2" l="ENG"><s0>pilot plants</s0>
</fC03>
<fC03 i1="06" i2="2" l="SPA"><s0>Planta piloto</s0>
</fC03>
<fC03 i1="07" i2="2" l="FRE"><s0>Puits réinjection</s0>
</fC03>
<fC03 i1="07" i2="2" l="ENG"><s0>reinjection wells</s0>
</fC03>
<fC03 i1="07" i2="2" l="SPA"><s0>Pozo reinyección</s0>
</fC03>
<fC03 i1="08" i2="2" l="FRE"><s0>Saumure</s0>
</fC03>
<fC03 i1="08" i2="2" l="ENG"><s0>brines</s0>
</fC03>
<fC03 i1="08" i2="2" l="SPA"><s0>Salmuera</s0>
</fC03>
<fC03 i1="09" i2="2" l="FRE"><s0>Exploitation</s0>
</fC03>
<fC03 i1="09" i2="2" l="ENG"><s0>exploitation</s0>
</fC03>
<fC03 i1="09" i2="2" l="SPA"><s0>Explotación</s0>
</fC03>
<fC03 i1="10" i2="2" l="FRE"><s0>Perspective</s0>
</fC03>
<fC03 i1="10" i2="2" l="ENG"><s0>possibilities</s0>
</fC03>
<fC03 i1="10" i2="2" l="SPA"><s0>Perspectiva</s0>
</fC03>
<fC03 i1="11" i2="2" l="FRE"><s0>Hydrochimie</s0>
</fC03>
<fC03 i1="11" i2="2" l="ENG"><s0>hydrochemistry</s0>
</fC03>
<fC03 i1="11" i2="2" l="SPA"><s0>Hidroquímica</s0>
</fC03>
<fC03 i1="12" i2="2" l="FRE"><s0>Vapeur eau</s0>
</fC03>
<fC03 i1="12" i2="2" l="ENG"><s0>water vapor</s0>
</fC03>
<fC03 i1="12" i2="2" l="SPA"><s0>Vapor agua</s0>
</fC03>
<fC03 i1="13" i2="2" l="FRE"><s0>Gaz hydrogène sulfuré</s0>
</fC03>
<fC03 i1="13" i2="2" l="ENG"><s0>hydrogen sulfide</s0>
</fC03>
<fC03 i1="13" i2="2" l="SPA"><s0>Gas sulfhídrico</s0>
</fC03>
<fC03 i1="14" i2="2" l="FRE"><s0>Ile Milos</s0>
<s4>INC</s4>
</fC03>
<fC03 i1="15" i2="2" l="FRE"><s0>Ile Nisyros</s0>
<s4>INC</s4>
</fC03>
<fC06><s0>ILS</s0>
<s0>TAS</s0>
<s0>ANS</s0>
</fC06>
<fC07 i1="01" i2="2" l="FRE"><s0>Europe</s0>
<s2>NG</s2>
</fC07>
<fC07 i1="01" i2="2" l="ENG"><s0>Europe</s0>
<s2>NG</s2>
</fC07>
<fC07 i1="01" i2="2" l="SPA"><s0>Europa</s0>
<s2>NG</s2>
</fC07>
<fC07 i1="02" i2="2" l="FRE"><s0>Roche chimique</s0>
</fC07>
<fC07 i1="02" i2="2" l="ENG"><s0>chemically precipitated rocks</s0>
</fC07>
<fC07 i1="02" i2="2" l="SPA"><s0>Roca química</s0>
</fC07>
<fC07 i1="03" i2="2" l="FRE"><s0>Roche sédimentaire</s0>
</fC07>
<fC07 i1="03" i2="2" l="ENG"><s0>sedimentary rocks</s0>
</fC07>
<fC07 i1="03" i2="2" l="SPA"><s0>Roca sedimentaria</s0>
</fC07>
<fN21><s1>132</s1>
</fN21>
</pA>
<pR><fA30 i1="01" i2="1" l="ENG"><s1>Industrial uses of geothermal energy. International conference</s1>
<s3>Reykjavik ISL</s3>
<s4>1992-09-02</s4>
</fA30>
</pR>
</standard>
<server><NO>PASCAL 93-0352464 INIST</NO>
<ET>Update of geothermal energy development in Greece</ET>
<AU>KOUTROUPIS (N.); STEINGRIMSON (Benedikt); ELIASSON (Einar Tjörvi); LINDAL (Baldur); PALMASON (Gudmundur)</AU>
<AF>Public Power Corp./106 80 Athens/Grèce; Orkustofnun/Reykjavik/Islande (1 aut., 2 aut.)</AF>
<DT>Publication en série; Congrès; Niveau analytique</DT>
<SO>Geothermics; ISSN 0375-6505; Coden GTMCAT; Etats-Unis; Da. 1992; Vol. 21; No. 5-6; Pp. 881-890; Bibl. 1 ref.</SO>
<LA>Anglais</LA>
<EA>Following the completion of the Geothermal Reconnaissance Study in Greece and the successful drilling of seven deep geothermal wells in the Aegean islands of Milos and Nisyros, PPC started the first step towards geothermal development for electricity production as follows: A geothermal electric pilot plant of 2 MW<sub>e</sub>
nominal capacity was installed on the Zephyria plain in Milos island (1985). During a nine month operation of the plant, problems connected with its long term operation were solved (hot reinjection of the high salinity brine, turbine washing etc). A feasibility study regarding exploitation of the Nisyros geothermal resources was completed and PPC connected Nisyros island electrically to Kos island via submarine cables</EA>
<CC>226B03; 001E01O03</CC>
<FD>Energie géothermique; Grèce; Puits eau; Iles Egée Grèce; Centrale électrique; Usine pilote; Puits réinjection; Saumure; Exploitation; Perspective; Hydrochimie; Vapeur eau; Gaz hydrogène sulfuré; Ile Milos; Ile Nisyros</FD>
<FG>Europe; Roche chimique; Roche sédimentaire</FG>
<ED>geothermal energy; Greece; water wells; Greek Aegean Islands; power plants; pilot plants; reinjection wells; brines; exploitation; possibilities; hydrochemistry; water vapor; hydrogen sulfide</ED>
<EG>Europe; chemically precipitated rocks; sedimentary rocks</EG>
<SD>Energía geotérmica; Grecia; Pozo agua; Islas Egeas Griegas; Central eléctrica; Planta piloto; Pozo reinyección; Salmuera; Explotación; Perspectiva; Hidroquímica; Vapor agua; Gas sulfhídrico</SD>
<LO>INIST-17178.354000032888010280</LO>
<ID>93-0352464</ID>
</server>
</inist>
</record>
Pour manipuler ce document sous Unix (Dilib)
EXPLOR_STEP=$WICRI_ROOT/Wicri/Terre/explor/NissirosV1/Data/PascalFrancis/Corpus
HfdSelect -h $EXPLOR_STEP/biblio.hfd -nk 000059 | SxmlIndent | more
Ou
HfdSelect -h $EXPLOR_AREA/Data/PascalFrancis/Corpus/biblio.hfd -nk 000059 | SxmlIndent | more
Pour mettre un lien sur cette page dans le réseau Wicri
{{Explor lien
|wiki= Wicri/Terre
|area= NissirosV1
|flux= PascalFrancis
|étape= Corpus
|type= RBID
|clé= Pascal:93-0352464
|texte= Update of geothermal energy development in Greece
}}
| This area was generated with Dilib version V0.6.33. Data generation: Tue Jan 16 00:18:27 2018. Site generation: Mon Feb 1 22:09:13 2021 | |