Serveur d'exploration Nissiros

Attention, ce site est en cours de développement !
Attention, site généré par des moyens informatiques à partir de corpus bruts.
Les informations ne sont donc pas validées.

Update of geothermal energy development in Greece

Identifieur interne : 000059 ( PascalFrancis/Corpus ); précédent : 000058; suivant : 000060

Update of geothermal energy development in Greece

Auteurs : N. Koutroupis

Source :

RBID : Pascal:93-0352464

Descripteurs français

English descriptors

Abstract

Following the completion of the Geothermal Reconnaissance Study in Greece and the successful drilling of seven deep geothermal wells in the Aegean islands of Milos and Nisyros, PPC started the first step towards geothermal development for electricity production as follows: A geothermal electric pilot plant of 2 MWe nominal capacity was installed on the Zephyria plain in Milos island (1985). During a nine month operation of the plant, problems connected with its long term operation were solved (hot reinjection of the high salinity brine, turbine washing etc). A feasibility study regarding exploitation of the Nisyros geothermal resources was completed and PPC connected Nisyros island electrically to Kos island via submarine cables

Notice en format standard (ISO 2709)

Pour connaître la documentation sur le format Inist Standard.

pA  
A01 01  1    @0 0375-6505
A02 01      @0 GTMCAT
A03   1    @0 Geothermics
A05       @2 21
A06       @2 5-6
A08 01  1  ENG  @1 Update of geothermal energy development in Greece
A11 01  1    @1 KOUTROUPIS (N.)
A12 01  1    @1 STEINGRIMSON (Benedikt) @9 ed.
A12 02  1    @1 ELIASSON (Einar Tjörvi) @9 ed.
A12 03  1    @1 LINDAL (Baldur) @9 ed.
A12 04  1    @1 PALMASON (Gudmundur) @9 ed.
A14 01      @1 Public Power Corp. @2 106 80 Athens @3 GRC
A15 01      @1 Orkustofnun @2 Reykjavik @3 ISL @Z 1 aut. @Z 2 aut.
A18 01  1    @1 Federation of Icelandic Industries @3 ISL @9 patr.
A18 02  1    @1 International Geothermal Association @3 INT @9 patr.
A20       @1 881-890 @7 5
A21       @1 1992
A23 01      @0 ENG
A43 01      @1 INIST @2 17178 @5 354000032888010280
A44       @0 0000
A45       @0 1 ref.
A47 01  1    @0 93-0352464
A60       @1 P @2 C
A61       @0 A
A64   1    @0 Geothermics
A66 01      @0 USA
C01 01    ENG  @0 Following the completion of the Geothermal Reconnaissance Study in Greece and the successful drilling of seven deep geothermal wells in the Aegean islands of Milos and Nisyros, PPC started the first step towards geothermal development for electricity production as follows: A geothermal electric pilot plant of 2 MWe nominal capacity was installed on the Zephyria plain in Milos island (1985). During a nine month operation of the plant, problems connected with its long term operation were solved (hot reinjection of the high salinity brine, turbine washing etc). A feasibility study regarding exploitation of the Nisyros geothermal resources was completed and PPC connected Nisyros island electrically to Kos island via submarine cables
C02 01  2    @0 226B03
C02 02  X    @0 001E01O03
C03 01  2  FRE  @0 Energie géothermique
C03 01  2  ENG  @0 geothermal energy
C03 01  2  SPA  @0 Energía geotérmica
C03 02  2  FRE  @0 Grèce @2 NG
C03 02  2  ENG  @0 Greece @2 NG
C03 02  2  SPA  @0 Grecia @2 NG
C03 03  2  FRE  @0 Puits eau
C03 03  2  ENG  @0 water wells
C03 03  2  SPA  @0 Pozo agua
C03 04  2  FRE  @0 Iles Egée Grèce @2 NG
C03 04  2  ENG  @0 Greek Aegean Islands @2 NG
C03 04  2  SPA  @0 Islas Egeas Griegas @2 NG
C03 05  2  FRE  @0 Centrale électrique
C03 05  2  ENG  @0 power plants
C03 05  2  SPA  @0 Central eléctrica
C03 06  2  FRE  @0 Usine pilote
C03 06  2  ENG  @0 pilot plants
C03 06  2  SPA  @0 Planta piloto
C03 07  2  FRE  @0 Puits réinjection
C03 07  2  ENG  @0 reinjection wells
C03 07  2  SPA  @0 Pozo reinyección
C03 08  2  FRE  @0 Saumure
C03 08  2  ENG  @0 brines
C03 08  2  SPA  @0 Salmuera
C03 09  2  FRE  @0 Exploitation
C03 09  2  ENG  @0 exploitation
C03 09  2  SPA  @0 Explotación
C03 10  2  FRE  @0 Perspective
C03 10  2  ENG  @0 possibilities
C03 10  2  SPA  @0 Perspectiva
C03 11  2  FRE  @0 Hydrochimie
C03 11  2  ENG  @0 hydrochemistry
C03 11  2  SPA  @0 Hidroquímica
C03 12  2  FRE  @0 Vapeur eau
C03 12  2  ENG  @0 water vapor
C03 12  2  SPA  @0 Vapor agua
C03 13  2  FRE  @0 Gaz hydrogène sulfuré
C03 13  2  ENG  @0 hydrogen sulfide
C03 13  2  SPA  @0 Gas sulfhídrico
C03 14  2  FRE  @0 Ile Milos @4 INC
C03 15  2  FRE  @0 Ile Nisyros @4 INC
C06       @0 ILS @0 TAS @0 ANS
C07 01  2  FRE  @0 Europe @2 NG
C07 01  2  ENG  @0 Europe @2 NG
C07 01  2  SPA  @0 Europa @2 NG
C07 02  2  FRE  @0 Roche chimique
C07 02  2  ENG  @0 chemically precipitated rocks
C07 02  2  SPA  @0 Roca química
C07 03  2  FRE  @0 Roche sédimentaire
C07 03  2  ENG  @0 sedimentary rocks
C07 03  2  SPA  @0 Roca sedimentaria
N21       @1 132
pR  
A30 01  1  ENG  @1 Industrial uses of geothermal energy. International conference @3 Reykjavik ISL @4 1992-09-02

Format Inist (serveur)

NO : PASCAL 93-0352464 INIST
ET : Update of geothermal energy development in Greece
AU : KOUTROUPIS (N.); STEINGRIMSON (Benedikt); ELIASSON (Einar Tjörvi); LINDAL (Baldur); PALMASON (Gudmundur)
AF : Public Power Corp./106 80 Athens/Grèce; Orkustofnun/Reykjavik/Islande (1 aut., 2 aut.)
DT : Publication en série; Congrès; Niveau analytique
SO : Geothermics; ISSN 0375-6505; Coden GTMCAT; Etats-Unis; Da. 1992; Vol. 21; No. 5-6; Pp. 881-890; Bibl. 1 ref.
LA : Anglais
EA : Following the completion of the Geothermal Reconnaissance Study in Greece and the successful drilling of seven deep geothermal wells in the Aegean islands of Milos and Nisyros, PPC started the first step towards geothermal development for electricity production as follows: A geothermal electric pilot plant of 2 MWe nominal capacity was installed on the Zephyria plain in Milos island (1985). During a nine month operation of the plant, problems connected with its long term operation were solved (hot reinjection of the high salinity brine, turbine washing etc). A feasibility study regarding exploitation of the Nisyros geothermal resources was completed and PPC connected Nisyros island electrically to Kos island via submarine cables
CC : 226B03; 001E01O03
FD : Energie géothermique; Grèce; Puits eau; Iles Egée Grèce; Centrale électrique; Usine pilote; Puits réinjection; Saumure; Exploitation; Perspective; Hydrochimie; Vapeur eau; Gaz hydrogène sulfuré; Ile Milos; Ile Nisyros
FG : Europe; Roche chimique; Roche sédimentaire
ED : geothermal energy; Greece; water wells; Greek Aegean Islands; power plants; pilot plants; reinjection wells; brines; exploitation; possibilities; hydrochemistry; water vapor; hydrogen sulfide
EG : Europe; chemically precipitated rocks; sedimentary rocks
SD : Energía geotérmica; Grecia; Pozo agua; Islas Egeas Griegas; Central eléctrica; Planta piloto; Pozo reinyección; Salmuera; Explotación; Perspectiva; Hidroquímica; Vapor agua; Gas sulfhídrico
LO : INIST-17178.354000032888010280
ID : 93-0352464

Links to Exploration step

Pascal:93-0352464

Le document en format XML

<record>
<TEI>
<teiHeader>
<fileDesc>
<titleStmt>
<title xml:lang="en" level="a">Update of geothermal energy development in Greece</title>
<author>
<name sortKey="Koutroupis, N" sort="Koutroupis, N" uniqKey="Koutroupis N" first="N." last="Koutroupis">N. Koutroupis</name>
<affiliation>
<inist:fA14 i1="01">
<s1>Public Power Corp.</s1>
<s2>106 80 Athens</s2>
<s3>GRC</s3>
</inist:fA14>
</affiliation>
</author>
</titleStmt>
<publicationStmt>
<idno type="wicri:source">INIST</idno>
<idno type="inist">93-0352464</idno>
<date when="1992">1992</date>
<idno type="stanalyst">PASCAL 93-0352464 INIST</idno>
<idno type="RBID">Pascal:93-0352464</idno>
<idno type="wicri:Area/PascalFrancis/Corpus">000059</idno>
</publicationStmt>
<sourceDesc>
<biblStruct>
<analytic>
<title xml:lang="en" level="a">Update of geothermal energy development in Greece</title>
<author>
<name sortKey="Koutroupis, N" sort="Koutroupis, N" uniqKey="Koutroupis N" first="N." last="Koutroupis">N. Koutroupis</name>
<affiliation>
<inist:fA14 i1="01">
<s1>Public Power Corp.</s1>
<s2>106 80 Athens</s2>
<s3>GRC</s3>
</inist:fA14>
</affiliation>
</author>
</analytic>
<series>
<title level="j" type="main">Geothermics</title>
<title level="j" type="abbreviated">Geothermics</title>
<idno type="ISSN">0375-6505</idno>
<imprint>
<date when="1992">1992</date>
</imprint>
</series>
</biblStruct>
</sourceDesc>
<seriesStmt>
<title level="j" type="main">Geothermics</title>
<title level="j" type="abbreviated">Geothermics</title>
<idno type="ISSN">0375-6505</idno>
</seriesStmt>
</fileDesc>
<profileDesc>
<textClass>
<keywords scheme="KwdEn" xml:lang="en">
<term>Greece</term>
<term>Greek Aegean Islands</term>
<term>brines</term>
<term>exploitation</term>
<term>geothermal energy</term>
<term>hydrochemistry</term>
<term>hydrogen sulfide</term>
<term>pilot plants</term>
<term>possibilities</term>
<term>power plants</term>
<term>reinjection wells</term>
<term>water vapor</term>
<term>water wells</term>
</keywords>
<keywords scheme="Pascal" xml:lang="fr">
<term>Energie géothermique</term>
<term>Grèce</term>
<term>Puits eau</term>
<term>Iles Egée Grèce</term>
<term>Centrale électrique</term>
<term>Usine pilote</term>
<term>Puits réinjection</term>
<term>Saumure</term>
<term>Exploitation</term>
<term>Perspective</term>
<term>Hydrochimie</term>
<term>Vapeur eau</term>
<term>Gaz hydrogène sulfuré</term>
<term>Ile Milos</term>
<term>Ile Nisyros</term>
</keywords>
</textClass>
</profileDesc>
</teiHeader>
<front>
<div type="abstract" xml:lang="en">Following the completion of the Geothermal Reconnaissance Study in Greece and the successful drilling of seven deep geothermal wells in the Aegean islands of Milos and Nisyros, PPC started the first step towards geothermal development for electricity production as follows: A geothermal electric pilot plant of 2 MW
<sub>e</sub>
nominal capacity was installed on the Zephyria plain in Milos island (1985). During a nine month operation of the plant, problems connected with its long term operation were solved (hot reinjection of the high salinity brine, turbine washing etc). A feasibility study regarding exploitation of the Nisyros geothermal resources was completed and PPC connected Nisyros island electrically to Kos island via submarine cables</div>
</front>
</TEI>
<inist>
<standard h6="B">
<pA>
<fA01 i1="01" i2="1">
<s0>0375-6505</s0>
</fA01>
<fA02 i1="01">
<s0>GTMCAT</s0>
</fA02>
<fA03 i2="1">
<s0>Geothermics</s0>
</fA03>
<fA05>
<s2>21</s2>
</fA05>
<fA06>
<s2>5-6</s2>
</fA06>
<fA08 i1="01" i2="1" l="ENG">
<s1>Update of geothermal energy development in Greece</s1>
</fA08>
<fA11 i1="01" i2="1">
<s1>KOUTROUPIS (N.)</s1>
</fA11>
<fA12 i1="01" i2="1">
<s1>STEINGRIMSON (Benedikt)</s1>
<s9>ed.</s9>
</fA12>
<fA12 i1="02" i2="1">
<s1>ELIASSON (Einar Tjörvi)</s1>
<s9>ed.</s9>
</fA12>
<fA12 i1="03" i2="1">
<s1>LINDAL (Baldur)</s1>
<s9>ed.</s9>
</fA12>
<fA12 i1="04" i2="1">
<s1>PALMASON (Gudmundur)</s1>
<s9>ed.</s9>
</fA12>
<fA14 i1="01">
<s1>Public Power Corp.</s1>
<s2>106 80 Athens</s2>
<s3>GRC</s3>
</fA14>
<fA15 i1="01">
<s1>Orkustofnun</s1>
<s2>Reykjavik</s2>
<s3>ISL</s3>
<sZ>1 aut.</sZ>
<sZ>2 aut.</sZ>
</fA15>
<fA18 i1="01" i2="1">
<s1>Federation of Icelandic Industries</s1>
<s3>ISL</s3>
<s9>patr.</s9>
</fA18>
<fA18 i1="02" i2="1">
<s1>International Geothermal Association</s1>
<s3>INT</s3>
<s9>patr.</s9>
</fA18>
<fA20>
<s1>881-890</s1>
<s7>5</s7>
</fA20>
<fA21>
<s1>1992</s1>
</fA21>
<fA23 i1="01">
<s0>ENG</s0>
</fA23>
<fA43 i1="01">
<s1>INIST</s1>
<s2>17178</s2>
<s5>354000032888010280</s5>
</fA43>
<fA44>
<s0>0000</s0>
</fA44>
<fA45>
<s0>1 ref.</s0>
</fA45>
<fA47 i1="01" i2="1">
<s0>93-0352464</s0>
</fA47>
<fA60>
<s1>P</s1>
<s2>C</s2>
</fA60>
<fA61>
<s0>A</s0>
</fA61>
<fA64 i2="1">
<s0>Geothermics</s0>
</fA64>
<fA66 i1="01">
<s0>USA</s0>
</fA66>
<fC01 i1="01" l="ENG">
<s0>Following the completion of the Geothermal Reconnaissance Study in Greece and the successful drilling of seven deep geothermal wells in the Aegean islands of Milos and Nisyros, PPC started the first step towards geothermal development for electricity production as follows: A geothermal electric pilot plant of 2 MW
<sub>e</sub>
nominal capacity was installed on the Zephyria plain in Milos island (1985). During a nine month operation of the plant, problems connected with its long term operation were solved (hot reinjection of the high salinity brine, turbine washing etc). A feasibility study regarding exploitation of the Nisyros geothermal resources was completed and PPC connected Nisyros island electrically to Kos island via submarine cables</s0>
</fC01>
<fC02 i1="01" i2="2">
<s0>226B03</s0>
</fC02>
<fC02 i1="02" i2="X">
<s0>001E01O03</s0>
</fC02>
<fC03 i1="01" i2="2" l="FRE">
<s0>Energie géothermique</s0>
</fC03>
<fC03 i1="01" i2="2" l="ENG">
<s0>geothermal energy</s0>
</fC03>
<fC03 i1="01" i2="2" l="SPA">
<s0>Energía geotérmica</s0>
</fC03>
<fC03 i1="02" i2="2" l="FRE">
<s0>Grèce</s0>
<s2>NG</s2>
</fC03>
<fC03 i1="02" i2="2" l="ENG">
<s0>Greece</s0>
<s2>NG</s2>
</fC03>
<fC03 i1="02" i2="2" l="SPA">
<s0>Grecia</s0>
<s2>NG</s2>
</fC03>
<fC03 i1="03" i2="2" l="FRE">
<s0>Puits eau</s0>
</fC03>
<fC03 i1="03" i2="2" l="ENG">
<s0>water wells</s0>
</fC03>
<fC03 i1="03" i2="2" l="SPA">
<s0>Pozo agua</s0>
</fC03>
<fC03 i1="04" i2="2" l="FRE">
<s0>Iles Egée Grèce</s0>
<s2>NG</s2>
</fC03>
<fC03 i1="04" i2="2" l="ENG">
<s0>Greek Aegean Islands</s0>
<s2>NG</s2>
</fC03>
<fC03 i1="04" i2="2" l="SPA">
<s0>Islas Egeas Griegas</s0>
<s2>NG</s2>
</fC03>
<fC03 i1="05" i2="2" l="FRE">
<s0>Centrale électrique</s0>
</fC03>
<fC03 i1="05" i2="2" l="ENG">
<s0>power plants</s0>
</fC03>
<fC03 i1="05" i2="2" l="SPA">
<s0>Central eléctrica</s0>
</fC03>
<fC03 i1="06" i2="2" l="FRE">
<s0>Usine pilote</s0>
</fC03>
<fC03 i1="06" i2="2" l="ENG">
<s0>pilot plants</s0>
</fC03>
<fC03 i1="06" i2="2" l="SPA">
<s0>Planta piloto</s0>
</fC03>
<fC03 i1="07" i2="2" l="FRE">
<s0>Puits réinjection</s0>
</fC03>
<fC03 i1="07" i2="2" l="ENG">
<s0>reinjection wells</s0>
</fC03>
<fC03 i1="07" i2="2" l="SPA">
<s0>Pozo reinyección</s0>
</fC03>
<fC03 i1="08" i2="2" l="FRE">
<s0>Saumure</s0>
</fC03>
<fC03 i1="08" i2="2" l="ENG">
<s0>brines</s0>
</fC03>
<fC03 i1="08" i2="2" l="SPA">
<s0>Salmuera</s0>
</fC03>
<fC03 i1="09" i2="2" l="FRE">
<s0>Exploitation</s0>
</fC03>
<fC03 i1="09" i2="2" l="ENG">
<s0>exploitation</s0>
</fC03>
<fC03 i1="09" i2="2" l="SPA">
<s0>Explotación</s0>
</fC03>
<fC03 i1="10" i2="2" l="FRE">
<s0>Perspective</s0>
</fC03>
<fC03 i1="10" i2="2" l="ENG">
<s0>possibilities</s0>
</fC03>
<fC03 i1="10" i2="2" l="SPA">
<s0>Perspectiva</s0>
</fC03>
<fC03 i1="11" i2="2" l="FRE">
<s0>Hydrochimie</s0>
</fC03>
<fC03 i1="11" i2="2" l="ENG">
<s0>hydrochemistry</s0>
</fC03>
<fC03 i1="11" i2="2" l="SPA">
<s0>Hidroquímica</s0>
</fC03>
<fC03 i1="12" i2="2" l="FRE">
<s0>Vapeur eau</s0>
</fC03>
<fC03 i1="12" i2="2" l="ENG">
<s0>water vapor</s0>
</fC03>
<fC03 i1="12" i2="2" l="SPA">
<s0>Vapor agua</s0>
</fC03>
<fC03 i1="13" i2="2" l="FRE">
<s0>Gaz hydrogène sulfuré</s0>
</fC03>
<fC03 i1="13" i2="2" l="ENG">
<s0>hydrogen sulfide</s0>
</fC03>
<fC03 i1="13" i2="2" l="SPA">
<s0>Gas sulfhídrico</s0>
</fC03>
<fC03 i1="14" i2="2" l="FRE">
<s0>Ile Milos</s0>
<s4>INC</s4>
</fC03>
<fC03 i1="15" i2="2" l="FRE">
<s0>Ile Nisyros</s0>
<s4>INC</s4>
</fC03>
<fC06>
<s0>ILS</s0>
<s0>TAS</s0>
<s0>ANS</s0>
</fC06>
<fC07 i1="01" i2="2" l="FRE">
<s0>Europe</s0>
<s2>NG</s2>
</fC07>
<fC07 i1="01" i2="2" l="ENG">
<s0>Europe</s0>
<s2>NG</s2>
</fC07>
<fC07 i1="01" i2="2" l="SPA">
<s0>Europa</s0>
<s2>NG</s2>
</fC07>
<fC07 i1="02" i2="2" l="FRE">
<s0>Roche chimique</s0>
</fC07>
<fC07 i1="02" i2="2" l="ENG">
<s0>chemically precipitated rocks</s0>
</fC07>
<fC07 i1="02" i2="2" l="SPA">
<s0>Roca química</s0>
</fC07>
<fC07 i1="03" i2="2" l="FRE">
<s0>Roche sédimentaire</s0>
</fC07>
<fC07 i1="03" i2="2" l="ENG">
<s0>sedimentary rocks</s0>
</fC07>
<fC07 i1="03" i2="2" l="SPA">
<s0>Roca sedimentaria</s0>
</fC07>
<fN21>
<s1>132</s1>
</fN21>
</pA>
<pR>
<fA30 i1="01" i2="1" l="ENG">
<s1>Industrial uses of geothermal energy. International conference</s1>
<s3>Reykjavik ISL</s3>
<s4>1992-09-02</s4>
</fA30>
</pR>
</standard>
<server>
<NO>PASCAL 93-0352464 INIST</NO>
<ET>Update of geothermal energy development in Greece</ET>
<AU>KOUTROUPIS (N.); STEINGRIMSON (Benedikt); ELIASSON (Einar Tjörvi); LINDAL (Baldur); PALMASON (Gudmundur)</AU>
<AF>Public Power Corp./106 80 Athens/Grèce; Orkustofnun/Reykjavik/Islande (1 aut., 2 aut.)</AF>
<DT>Publication en série; Congrès; Niveau analytique</DT>
<SO>Geothermics; ISSN 0375-6505; Coden GTMCAT; Etats-Unis; Da. 1992; Vol. 21; No. 5-6; Pp. 881-890; Bibl. 1 ref.</SO>
<LA>Anglais</LA>
<EA>Following the completion of the Geothermal Reconnaissance Study in Greece and the successful drilling of seven deep geothermal wells in the Aegean islands of Milos and Nisyros, PPC started the first step towards geothermal development for electricity production as follows: A geothermal electric pilot plant of 2 MW
<sub>e</sub>
nominal capacity was installed on the Zephyria plain in Milos island (1985). During a nine month operation of the plant, problems connected with its long term operation were solved (hot reinjection of the high salinity brine, turbine washing etc). A feasibility study regarding exploitation of the Nisyros geothermal resources was completed and PPC connected Nisyros island electrically to Kos island via submarine cables</EA>
<CC>226B03; 001E01O03</CC>
<FD>Energie géothermique; Grèce; Puits eau; Iles Egée Grèce; Centrale électrique; Usine pilote; Puits réinjection; Saumure; Exploitation; Perspective; Hydrochimie; Vapeur eau; Gaz hydrogène sulfuré; Ile Milos; Ile Nisyros</FD>
<FG>Europe; Roche chimique; Roche sédimentaire</FG>
<ED>geothermal energy; Greece; water wells; Greek Aegean Islands; power plants; pilot plants; reinjection wells; brines; exploitation; possibilities; hydrochemistry; water vapor; hydrogen sulfide</ED>
<EG>Europe; chemically precipitated rocks; sedimentary rocks</EG>
<SD>Energía geotérmica; Grecia; Pozo agua; Islas Egeas Griegas; Central eléctrica; Planta piloto; Pozo reinyección; Salmuera; Explotación; Perspectiva; Hidroquímica; Vapor agua; Gas sulfhídrico</SD>
<LO>INIST-17178.354000032888010280</LO>
<ID>93-0352464</ID>
</server>
</inist>
</record>

Pour manipuler ce document sous Unix (Dilib)

EXPLOR_STEP=$WICRI_ROOT/Wicri/Terre/explor/NissirosV1/Data/PascalFrancis/Corpus
HfdSelect -h $EXPLOR_STEP/biblio.hfd -nk 000059 | SxmlIndent | more

Ou

HfdSelect -h $EXPLOR_AREA/Data/PascalFrancis/Corpus/biblio.hfd -nk 000059 | SxmlIndent | more

Pour mettre un lien sur cette page dans le réseau Wicri

{{Explor lien
   |wiki=    Wicri/Terre
   |area=    NissirosV1
   |flux=    PascalFrancis
   |étape=   Corpus
   |type=    RBID
   |clé=     Pascal:93-0352464
   |texte=   Update of geothermal energy development in Greece
}}

Wicri

This area was generated with Dilib version V0.6.33.
Data generation: Tue Jan 16 00:18:27 2018. Site generation: Mon Feb 1 22:09:13 2021