RESSEEPE
RESSEEPE | |
Budget : | 13 687 k€ |
Subventions : | FP7-NMP (8 800 k€) |
Sous-programme : | Integration of technologies for energy-efficient solutions in the renovation of public buildings |
Type de contrat : | Collaborative Project targeted to a special group |
Début : | 1er juillet 2013 |
Fin : | 30 juin 2017 |
RESSEEPE est l'acronyme du projet européen Retrofitting Solutions and Services for the enhancement of Energy Efficiency in Public Edification, qui a pour référence sur le service CORDIS 609377[1].
Note : Les objectifs suivants sont repris de la fiche du projet sur Cordis
- Objective
RESEEPE will bring together design and decision making tools, innovative building fabric manufacturers and a strong demonstration programme to demonstrate the improved building performance through retrofitting. The core idea of the RESSEEPE project is to technically advance, adapt, demonstrate and assess a number of innovative retrofit technologies. Reductions in the area of 50% will be achieved in terms of energy consumption. A systemic process will be also implemented that will allow the selection of the best possible retrofitting mix, customised to the needs of the particular building.
Several remarkable innovative technologies and materials will be integrated in the retrofitting process:
- envelope retrofitting: Ventilated Facades, Aerogel-based Superinsulating mortar, Wooden Insulating Wall Panel and VIP Panel;
- integration of RES: PV Energy, Thermal Collectors;
- energy storage systems: Thermal storage and PCMs;
- nanotechnologies and smart materials: EC/PV Windows;
- ICT: Strategies at building and district level;
- intelligent building controls: HVAC systems.
The RESSEEPE framework will be validated and refined by a strong demonstration programme, envisaging the renovation of 102.000 square meters of public buildings, arriving to a total renovation of 205.000 square meters that will be deployed in the following years. The estimated average of energy consumption in the renovated demo sites, on final energy, will be 66 kWh/m2/year, representing a 63% of reduction in energy consumption compared to the current situation. CO2 emissions will be 48,15 kg/m2/year, corresponding to more than 60 % of reduction. The total emissions avoided by the demo sites will be 2257 tCO2/year.
Associated investment costs to building renovation are expected to represent a maximum of 19% on average of the total costs of building an equivalent new building in the same location. On average, the return on investment will be around 7,6 years.Les partenaires du projet
Coordinateur du projet
- Integrated Environmental Solutions Ltd - Glasgow (Royaume-Uni)
Partenaires
- Technische Universitaet Wien - Vienne (Autriche)
- Consorzio Interuniversitario Nazionale per la Scienza e Tecnologia dei Materiali - Florence (Italie)
- Phase Change Material Products Ltd - Peterborough Cambs (Royaume-Uni)
- Javni Zavod Republike Slovenije za Varstvo Kulturne Dediscine - Ljubljana (Slovénie)
- Consorci Sanitari de Terrassa - Terrassa (Espagne)
- Acondicionamiento Tarrasense - Terrassa (Espagne)
- Coventry University - Coventry (Royaume-Uni)
- Eidgenoessische Materialpruefungs- und Forschungsanstalt - Duebendorf (Suisse)
- Fundacion Tecnalia Research & Innovation - Derio (Espagne)
- Applied Industrial Technologies Ltd - Gerakas (Grèce)
- Fundacio Privada Ascamm - Cerdanyola del Valles (Espagne)
- Exergy Ltd - Coventry (Royaume-Uni)
- Nobatek - Anglet (Aquitaine, France)
- Skelleftea Kommun - Skelleftea (Suède)
- Onexit Idatec SL - Baracaldo (Espagne)
- Babcock Support Services Ltd - Glasgow (Royaume-Uni)
- Centre CIM Fundacio Privada - Barcelone (Espagne)
- Universitat Politecnica de Catalunya - Barcelone (Espagne)
- Corporacio Sanitaria Parc Tauli de Sabadell - Sabadell (Espagne)
- Va-Q-Tec AG - Wurtzbourg (Bavière - Allemagne)
- Logement et gestion immobilière pour la région parisienne - Suresnes (Île-de-France, France)
- Incurvo SLU - Barcelone (Espagne)
- Separex SAS - Champigneulles (Lorraine, France)
- Vertech Group Sarl - Paris (Île-de-France, France)
Financement
- Coût total du projet : 13 686 932 €
- Subvention de la Commission européenne (programme FP7-NMP) : 8 800 000 €
Dates importantes
- Date de début : 1er juillet 2013
- Date de fin : 30 juin 2017
Notes
- ↑ La fiche du projet sur CORDIS