Serveur d'exploration sur l'opéra

Attention, ce site est en cours de développement !
Attention, site généré par des moyens informatiques à partir de corpus bruts.
Les informations ne sont donc pas validées.

The influence of the large diameter bored cast-in-place piles on foundation of old building

Identifieur interne : 002D14 ( Main/Exploration ); précédent : 002D13; suivant : 002D15

The influence of the large diameter bored cast-in-place piles on foundation of old building

Auteurs : V. Celmins [Lettonie]

Source :

RBID : Pascal:96-0444089

Descripteurs français

English descriptors

Abstract

Large diameter bored and cast in place piles were used in renovation design of Latvia Nationaal Opera house. The piles diameter was 1,50 m, length - 17 m. Distance to the nearest foundations of existing building of old Opera house - 3,50 m. The installation was done with equipment "KATO", produced in Japan. The borehole steel casing the first eleven meters go through medium, water-saturated sand, the next two meters - through clay soils, the last four meters - through marl with gypsum. After installation one corner of the existing building of old Opera house had a large settlement of 40 mm per four years. The checking of installation work records revealed serious mistakes in installation process


Affiliations:


Links toward previous steps (curation, corpus...)


Le document en format XML

<record>
<TEI>
<teiHeader>
<fileDesc>
<titleStmt>
<title xml:lang="en" level="a">The influence of the large diameter bored cast-in-place piles on foundation of old building</title>
<author>
<name sortKey="Celmins, V" sort="Celmins, V" uniqKey="Celmins V" first="V." last="Celmins">V. Celmins</name>
<affiliation wicri:level="1">
<inist:fA14 i1="01">
<s1>Celminia Buvkonctrukciju projektesanas birojs</s1>
<s2>Riga</s2>
<s3>LVA</s3>
</inist:fA14>
<country>Lettonie</country>
<wicri:noRegion>Celminia Buvkonctrukciju projektesanas birojs</wicri:noRegion>
</affiliation>
</author>
</titleStmt>
<publicationStmt>
<idno type="wicri:source">INIST</idno>
<idno type="inist">96-0444089</idno>
<date when="1995">1995</date>
<idno type="stanalyst">PASCAL 96-0444089 BRGM</idno>
<idno type="RBID">Pascal:96-0444089</idno>
<idno type="wicri:Area/PascalFrancis/Corpus">000957</idno>
<idno type="wicri:Area/PascalFrancis/Curation">000B72</idno>
<idno type="wicri:Area/PascalFrancis/Checkpoint">000967</idno>
<idno type="wicri:Area/Main/Merge">002E42</idno>
<idno type="wicri:Area/Main/Curation">002D14</idno>
<idno type="wicri:Area/Main/Exploration">002D14</idno>
</publicationStmt>
<sourceDesc>
<biblStruct>
<analytic>
<title xml:lang="en" level="a">The influence of the large diameter bored cast-in-place piles on foundation of old building</title>
<author>
<name sortKey="Celmins, V" sort="Celmins, V" uniqKey="Celmins V" first="V." last="Celmins">V. Celmins</name>
<affiliation wicri:level="1">
<inist:fA14 i1="01">
<s1>Celminia Buvkonctrukciju projektesanas birojs</s1>
<s2>Riga</s2>
<s3>LVA</s3>
</inist:fA14>
<country>Lettonie</country>
<wicri:noRegion>Celminia Buvkonctrukciju projektesanas birojs</wicri:noRegion>
</affiliation>
</author>
</analytic>
</biblStruct>
</sourceDesc>
</fileDesc>
<profileDesc>
<textClass>
<keywords scheme="KwdEn" xml:lang="en">
<term>Latvia</term>
<term>buildings</term>
<term>foundations</term>
<term>piles</term>
<term>soil mechanics</term>
</keywords>
<keywords scheme="Pascal" xml:lang="fr">
<term>Pieu</term>
<term>Bâtiment</term>
<term>Fondation</term>
<term>Mécanique sol</term>
<term>Lettonie</term>
</keywords>
<keywords scheme="Wicri" type="geographic" xml:lang="fr">
<term>Lettonie</term>
</keywords>
<keywords scheme="Wicri" type="topic" xml:lang="fr">
<term>Bâtiment</term>
<term>Fondation</term>
</keywords>
</textClass>
</profileDesc>
</teiHeader>
<front>
<div type="abstract" xml:lang="fr">Large diameter bored and cast in place piles were used in renovation design of Latvia Nationaal Opera house. The piles diameter was 1,50 m, length - 17 m. Distance to the nearest foundations of existing building of old Opera house - 3,50 m. The installation was done with equipment "KATO", produced in Japan. The borehole steel casing the first eleven meters go through medium, water-saturated sand, the next two meters - through clay soils, the last four meters - through marl with gypsum. After installation one corner of the existing building of old Opera house had a large settlement of 40 mm per four years. The checking of installation work records revealed serious mistakes in installation process</div>
</front>
</TEI>
<affiliations>
<list>
<country>
<li>Lettonie</li>
</country>
</list>
<tree>
<country name="Lettonie">
<noRegion>
<name sortKey="Celmins, V" sort="Celmins, V" uniqKey="Celmins V" first="V." last="Celmins">V. Celmins</name>
</noRegion>
</country>
</tree>
</affiliations>
</record>

Pour manipuler ce document sous Unix (Dilib)

EXPLOR_STEP=$WICRI_ROOT/Wicri/Musique/explor/OperaV1/Data/Main/Exploration
HfdSelect -h $EXPLOR_STEP/biblio.hfd -nk 002D14 | SxmlIndent | more

Ou

HfdSelect -h $EXPLOR_AREA/Data/Main/Exploration/biblio.hfd -nk 002D14 | SxmlIndent | more

Pour mettre un lien sur cette page dans le réseau Wicri

{{Explor lien
   |wiki=    Wicri/Musique
   |area=    OperaV1
   |flux=    Main
   |étape=   Exploration
   |type=    RBID
   |clé=     Pascal:96-0444089
   |texte=   The influence of the large diameter bored cast-in-place piles on foundation of old building
}}

Wicri

This area was generated with Dilib version V0.6.21.
Data generation: Thu Apr 14 14:59:05 2016. Site generation: Thu Jan 4 23:09:23 2024