The influence of the large diameter bored cast-in-place piles on foundation of old building
Identifieur interne : 002D14 ( Main/Exploration ); précédent : 002D13; suivant : 002D15The influence of the large diameter bored cast-in-place piles on foundation of old building
Auteurs : V. Celmins [Lettonie]Source :
Descripteurs français
- Pascal (Inist)
- Wicri :
English descriptors
- KwdEn :
Abstract
Large diameter bored and cast in place piles were used in renovation design of Latvia Nationaal Opera house. The piles diameter was 1,50 m, length - 17 m. Distance to the nearest foundations of existing building of old Opera house - 3,50 m. The installation was done with equipment "KATO", produced in Japan. The borehole steel casing the first eleven meters go through medium, water-saturated sand, the next two meters - through clay soils, the last four meters - through marl with gypsum. After installation one corner of the existing building of old Opera house had a large settlement of 40 mm per four years. The checking of installation work records revealed serious mistakes in installation process
Affiliations:
Links toward previous steps (curation, corpus...)
- to stream PascalFrancis, to step Corpus: 000957
- to stream PascalFrancis, to step Curation: 000B72
- to stream PascalFrancis, to step Checkpoint: 000967
- to stream Main, to step Merge: 002E42
- to stream Main, to step Curation: 002D14
Le document en format XML
<record><TEI><teiHeader><fileDesc><titleStmt><title xml:lang="en" level="a">The influence of the large diameter bored cast-in-place piles on foundation of old building</title>
<author><name sortKey="Celmins, V" sort="Celmins, V" uniqKey="Celmins V" first="V." last="Celmins">V. Celmins</name>
<affiliation wicri:level="1"><inist:fA14 i1="01"><s1>Celminia Buvkonctrukciju projektesanas birojs</s1>
<s2>Riga</s2>
<s3>LVA</s3>
</inist:fA14>
<country>Lettonie</country>
<wicri:noRegion>Celminia Buvkonctrukciju projektesanas birojs</wicri:noRegion>
</affiliation>
</author>
</titleStmt>
<publicationStmt><idno type="wicri:source">INIST</idno>
<idno type="inist">96-0444089</idno>
<date when="1995">1995</date>
<idno type="stanalyst">PASCAL 96-0444089 BRGM</idno>
<idno type="RBID">Pascal:96-0444089</idno>
<idno type="wicri:Area/PascalFrancis/Corpus">000957</idno>
<idno type="wicri:Area/PascalFrancis/Curation">000B72</idno>
<idno type="wicri:Area/PascalFrancis/Checkpoint">000967</idno>
<idno type="wicri:Area/Main/Merge">002E42</idno>
<idno type="wicri:Area/Main/Curation">002D14</idno>
<idno type="wicri:Area/Main/Exploration">002D14</idno>
</publicationStmt>
<sourceDesc><biblStruct><analytic><title xml:lang="en" level="a">The influence of the large diameter bored cast-in-place piles on foundation of old building</title>
<author><name sortKey="Celmins, V" sort="Celmins, V" uniqKey="Celmins V" first="V." last="Celmins">V. Celmins</name>
<affiliation wicri:level="1"><inist:fA14 i1="01"><s1>Celminia Buvkonctrukciju projektesanas birojs</s1>
<s2>Riga</s2>
<s3>LVA</s3>
</inist:fA14>
<country>Lettonie</country>
<wicri:noRegion>Celminia Buvkonctrukciju projektesanas birojs</wicri:noRegion>
</affiliation>
</author>
</analytic>
</biblStruct>
</sourceDesc>
</fileDesc>
<profileDesc><textClass><keywords scheme="KwdEn" xml:lang="en"><term>Latvia</term>
<term>buildings</term>
<term>foundations</term>
<term>piles</term>
<term>soil mechanics</term>
</keywords>
<keywords scheme="Pascal" xml:lang="fr"><term>Pieu</term>
<term>Bâtiment</term>
<term>Fondation</term>
<term>Mécanique sol</term>
<term>Lettonie</term>
</keywords>
<keywords scheme="Wicri" type="geographic" xml:lang="fr"><term>Lettonie</term>
</keywords>
<keywords scheme="Wicri" type="topic" xml:lang="fr"><term>Bâtiment</term>
<term>Fondation</term>
</keywords>
</textClass>
</profileDesc>
</teiHeader>
<front><div type="abstract" xml:lang="fr">Large diameter bored and cast in place piles were used in renovation design of Latvia Nationaal Opera house. The piles diameter was 1,50 m, length - 17 m. Distance to the nearest foundations of existing building of old Opera house - 3,50 m. The installation was done with equipment "KATO", produced in Japan. The borehole steel casing the first eleven meters go through medium, water-saturated sand, the next two meters - through clay soils, the last four meters - through marl with gypsum. After installation one corner of the existing building of old Opera house had a large settlement of 40 mm per four years. The checking of installation work records revealed serious mistakes in installation process</div>
</front>
</TEI>
<affiliations><list><country><li>Lettonie</li>
</country>
</list>
<tree><country name="Lettonie"><noRegion><name sortKey="Celmins, V" sort="Celmins, V" uniqKey="Celmins V" first="V." last="Celmins">V. Celmins</name>
</noRegion>
</country>
</tree>
</affiliations>
</record>
Pour manipuler ce document sous Unix (Dilib)
EXPLOR_STEP=$WICRI_ROOT/Wicri/Musique/explor/OperaV1/Data/Main/Exploration
HfdSelect -h $EXPLOR_STEP/biblio.hfd -nk 002D14 | SxmlIndent | more
Ou
HfdSelect -h $EXPLOR_AREA/Data/Main/Exploration/biblio.hfd -nk 002D14 | SxmlIndent | more
Pour mettre un lien sur cette page dans le réseau Wicri
{{Explor lien |wiki= Wicri/Musique |area= OperaV1 |flux= Main |étape= Exploration |type= RBID |clé= Pascal:96-0444089 |texte= The influence of the large diameter bored cast-in-place piles on foundation of old building }}
This area was generated with Dilib version V0.6.21. |