Serveur d'exploration sur la visibilité du Havre

Attention, ce site est en cours de développement !
Attention, site généré par des moyens informatiques à partir de corpus bruts.
Les informations ne sont donc pas validées.

The art of major bridge‐building – Hellmut Homberg and his contribution to multiple cable‐stayed spans

Identifieur interne : 001407 ( Istex/Corpus ); précédent : 001406; suivant : 001408

The art of major bridge‐building – Hellmut Homberg and his contribution to multiple cable‐stayed spans

Auteurs : Eberhard Pelke ; Kurrer

Source :

RBID : ISTEX:68C8C2751B6114C19E46E8F29B53A07A09A23608

English descriptors

Abstract

Based on findings from Büchenauer Bridge (1956), the North Elbe Bridge in Hamburg (1963) and the bridge over the Rhine at Leverkusen (1965), Homberg designed and engineered the Friedrich Ebert Bridge across the River Rhine. This was the first bridge in the world with cables that distribute instead of concentrate the load transfer, and thus define the bridge deck as a continuous, elastically supported element and not as a beam on point supports. After the building of major bridges declined in Germany, Homberg became active in France, and later rounded off his work with multi‐cable‐stayed bridges in the UK. That work resulted in the Queen Elizabeth II Bridge (1991), Homberg’s late magnum opus. This article contains a complete catalogue of Homberg’s multi‐cable‐stayed bridges and discusses for the first time previously unpublished designs by Homberg. These prove that he had already moved on from the classic cable‐stayed bridge to the general multi‐span cable‐stayed bridge as early as 1963.

Url:
DOI: 10.1002/stco.201210031

Links to Exploration step

ISTEX:68C8C2751B6114C19E46E8F29B53A07A09A23608

Le document en format XML

<record>
<TEI wicri:istexFullTextTei="biblStruct">
<teiHeader>
<fileDesc>
<titleStmt>
<title xml:lang="en">The art of major bridge‐building – Hellmut Homberg and his contribution to multiple cable‐stayed spans</title>
<author>
<name sortKey="Pelke, Eberhard" sort="Pelke, Eberhard" uniqKey="Pelke E" first="Eberhard" last="Pelke">Eberhard Pelke</name>
<affiliation>
<mods:affiliation>Hessen Mobil, Roads</mods:affiliation>
</affiliation>
</author>
<author>
<name sortKey="Kurrer" sort="Kurrer" uniqKey="Kurrer" last="Kurrer">Kurrer</name>
<affiliation>
<mods:affiliation>Ernst & Sohn, Berlin, Germany</mods:affiliation>
</affiliation>
</author>
</titleStmt>
<publicationStmt>
<idno type="wicri:source">ISTEX</idno>
<idno type="RBID">ISTEX:68C8C2751B6114C19E46E8F29B53A07A09A23608</idno>
<date when="2012" year="2012">2012</date>
<idno type="doi">10.1002/stco.201210031</idno>
<idno type="url">https://api.istex.fr/document/68C8C2751B6114C19E46E8F29B53A07A09A23608/fulltext/pdf</idno>
<idno type="wicri:Area/Istex/Corpus">001407</idno>
</publicationStmt>
<sourceDesc>
<biblStruct>
<analytic>
<title level="a" type="main" xml:lang="en">The art of major bridge‐building – Hellmut Homberg and his contribution to multiple cable‐stayed spans</title>
<author>
<name sortKey="Pelke, Eberhard" sort="Pelke, Eberhard" uniqKey="Pelke E" first="Eberhard" last="Pelke">Eberhard Pelke</name>
<affiliation>
<mods:affiliation>Hessen Mobil, Roads</mods:affiliation>
</affiliation>
</author>
<author>
<name sortKey="Kurrer" sort="Kurrer" uniqKey="Kurrer" last="Kurrer">Kurrer</name>
<affiliation>
<mods:affiliation>Ernst & Sohn, Berlin, Germany</mods:affiliation>
</affiliation>
</author>
</analytic>
<monogr></monogr>
<series>
<title level="j">Steel Construction</title>
<title level="j" type="abbrev">Steel Construction</title>
<idno type="ISSN">1867-0520</idno>
<idno type="eISSN">1867-0539</idno>
<imprint>
<publisher>WILEY‐VCH Verlag</publisher>
<pubPlace>Berlin</pubPlace>
<date type="published" when="2012-11">2012-11</date>
<biblScope unit="volume">5</biblScope>
<biblScope unit="issue">4</biblScope>
<biblScope unit="page" from="251">251</biblScope>
<biblScope unit="page" to="265">265</biblScope>
</imprint>
<idno type="ISSN">1867-0520</idno>
</series>
<idno type="istex">68C8C2751B6114C19E46E8F29B53A07A09A23608</idno>
<idno type="DOI">10.1002/stco.201210031</idno>
<idno type="ArticleID">STCO201210031</idno>
</biblStruct>
</sourceDesc>
<seriesStmt>
<idno type="ISSN">1867-0520</idno>
</seriesStmt>
</fileDesc>
<profileDesc>
<textClass>
<keywords scheme="KwdEn" xml:lang="en">
<term>biography</term>
<term>cable‐stayed bridge</term>
<term>elements of support</term>
<term>infrastructure</term>
<term>structural analysis</term>
<term>structural design</term>
</keywords>
</textClass>
<langUsage>
<language ident="en">en</language>
</langUsage>
</profileDesc>
</teiHeader>
<front>
<div type="abstract" xml:lang="de">Based on findings from Büchenauer Bridge (1956), the North Elbe Bridge in Hamburg (1963) and the bridge over the Rhine at Leverkusen (1965), Homberg designed and engineered the Friedrich Ebert Bridge across the River Rhine. This was the first bridge in the world with cables that distribute instead of concentrate the load transfer, and thus define the bridge deck as a continuous, elastically supported element and not as a beam on point supports. After the building of major bridges declined in Germany, Homberg became active in France, and later rounded off his work with multi‐cable‐stayed bridges in the UK. That work resulted in the Queen Elizabeth II Bridge (1991), Homberg’s late magnum opus. This article contains a complete catalogue of Homberg’s multi‐cable‐stayed bridges and discusses for the first time previously unpublished designs by Homberg. These prove that he had already moved on from the classic cable‐stayed bridge to the general multi‐span cable‐stayed bridge as early as 1963.</div>
</front>
</TEI>
<istex>
<corpusName>wiley</corpusName>
<author>
<json:item>
<name>Eberhard Pelke Dipl.‐Ing.</name>
<affiliations>
<json:string>Hessen Mobil, Roads</json:string>
</affiliations>
</json:item>
<json:item>
<name>Dr.‐Ing. Kurrer</name>
<affiliations>
<json:string>Ernst & Sohn, Berlin, Germany</json:string>
</affiliations>
</json:item>
</author>
<subject>
<json:item>
<lang>
<json:string>eng</json:string>
</lang>
<value>infrastructure</value>
</json:item>
<json:item>
<lang>
<json:string>eng</json:string>
</lang>
<value>cable‐stayed bridge</value>
</json:item>
<json:item>
<lang>
<json:string>eng</json:string>
</lang>
<value>structural analysis</value>
</json:item>
<json:item>
<lang>
<json:string>eng</json:string>
</lang>
<value>structural design</value>
</json:item>
<json:item>
<lang>
<json:string>eng</json:string>
</lang>
<value>elements of support</value>
</json:item>
<json:item>
<lang>
<json:string>eng</json:string>
</lang>
<value>biography</value>
</json:item>
</subject>
<articleId>
<json:string>STCO201210031</json:string>
</articleId>
<language>
<json:string>eng</json:string>
</language>
<originalGenre>
<json:string>article</json:string>
</originalGenre>
<abstract>Based on findings from Büchenauer Bridge (1956), the North Elbe Bridge in Hamburg (1963) and the bridge over the Rhine at Leverkusen (1965), Homberg designed and engineered the Friedrich Ebert Bridge across the River Rhine. This was the first bridge in the world with cables that distribute instead of concentrate the load transfer, and thus define the bridge deck as a continuous, elastically supported element and not as a beam on point supports. After the building of major bridges declined in Germany, Homberg became active in France, and later rounded off his work with multi‐cable‐stayed bridges in the UK. That work resulted in the Queen Elizabeth II Bridge (1991), Homberg’s late magnum opus. This article contains a complete catalogue of Homberg’s multi‐cable‐stayed bridges and discusses for the first time previously unpublished designs by Homberg. These prove that he had already moved on from the classic cable‐stayed bridge to the general multi‐span cable‐stayed bridge as early as 1963.</abstract>
<qualityIndicators>
<score>6.884</score>
<pdfVersion>1.3</pdfVersion>
<pdfPageSize>595.276 x 841.89 pts (A4)</pdfPageSize>
<refBibsNative>true</refBibsNative>
<keywordCount>6</keywordCount>
<abstractCharCount>1001</abstractCharCount>
<pdfWordCount>7353</pdfWordCount>
<pdfCharCount>49703</pdfCharCount>
<pdfPageCount>15</pdfPageCount>
<abstractWordCount>157</abstractWordCount>
</qualityIndicators>
<title>The art of major bridge‐building – Hellmut Homberg and his contribution to multiple cable‐stayed spans</title>
<genre>
<json:string>article</json:string>
</genre>
<host>
<volume>5</volume>
<publisherId>
<json:string>STCO</json:string>
</publisherId>
<pages>
<total>15</total>
<last>265</last>
<first>251</first>
</pages>
<issn>
<json:string>1867-0520</json:string>
</issn>
<issue>4</issue>
<subject>
<json:item>
<value>Report</value>
</json:item>
</subject>
<genre>
<json:string>journal</json:string>
</genre>
<language>
<json:string>unknown</json:string>
</language>
<eissn>
<json:string>1867-0539</json:string>
</eissn>
<title>Steel Construction</title>
<doi>
<json:string>10.1002/(ISSN)1867-0539</json:string>
</doi>
</host>
<publicationDate>2012</publicationDate>
<copyrightDate>2012</copyrightDate>
<doi>
<json:string>10.1002/stco.201210031</json:string>
</doi>
<id>68C8C2751B6114C19E46E8F29B53A07A09A23608</id>
<score>0.13198242</score>
<fulltext>
<json:item>
<original>true</original>
<mimetype>application/pdf</mimetype>
<extension>pdf</extension>
<uri>https://api.istex.fr/document/68C8C2751B6114C19E46E8F29B53A07A09A23608/fulltext/pdf</uri>
</json:item>
<json:item>
<original>false</original>
<mimetype>application/zip</mimetype>
<extension>zip</extension>
<uri>https://api.istex.fr/document/68C8C2751B6114C19E46E8F29B53A07A09A23608/fulltext/zip</uri>
</json:item>
<istex:fulltextTEI uri="https://api.istex.fr/document/68C8C2751B6114C19E46E8F29B53A07A09A23608/fulltext/tei">
<teiHeader>
<fileDesc>
<titleStmt>
<title level="a" type="main" xml:lang="en">The art of major bridge‐building – Hellmut Homberg and his contribution to multiple cable‐stayed spans</title>
</titleStmt>
<publicationStmt>
<authority>ISTEX</authority>
<publisher>WILEY‐VCH Verlag</publisher>
<pubPlace>Berlin</pubPlace>
<availability>
<p>Copyright © 2012 Ernst & Sohn Verlag für Architektur und technische Wissenschaften GmbH & Co. KG, Berlin</p>
</availability>
<date>2012</date>
</publicationStmt>
<sourceDesc>
<biblStruct type="inbook">
<analytic>
<title level="a" type="main" xml:lang="en">The art of major bridge‐building – Hellmut Homberg and his contribution to multiple cable‐stayed spans</title>
<author xml:id="author-1">
<persName>
<forename type="first">Eberhard</forename>
<surname>Pelke</surname>
</persName>
<roleName type="degree">Dipl.‐Ing.</roleName>
<note type="biography">Head of the Bridge Engineering Department</note>
<affiliation>Head of the Bridge Engineering Department</affiliation>
<affiliation>Hessen Mobil, Roads</affiliation>
</author>
<author xml:id="author-2">
<persName>
<surname>Kurrer</surname>
</persName>
<roleName type="degree">Dr.‐Ing.</roleName>
<note type="biography">Editor‐in‐Chief of “Stahlbau”</note>
<affiliation>Editor‐in‐Chief of “Stahlbau”</affiliation>
<affiliation>Ernst & Sohn, Berlin, Germany</affiliation>
</author>
</analytic>
<monogr>
<title level="j">Steel Construction</title>
<title level="j" type="abbrev">Steel Construction</title>
<idno type="pISSN">1867-0520</idno>
<idno type="eISSN">1867-0539</idno>
<idno type="DOI">10.1002/(ISSN)1867-0539</idno>
<imprint>
<publisher>WILEY‐VCH Verlag</publisher>
<pubPlace>Berlin</pubPlace>
<date type="published" when="2012-11"></date>
<biblScope unit="volume">5</biblScope>
<biblScope unit="issue">4</biblScope>
<biblScope unit="page" from="251">251</biblScope>
<biblScope unit="page" to="265">265</biblScope>
</imprint>
</monogr>
<idno type="istex">68C8C2751B6114C19E46E8F29B53A07A09A23608</idno>
<idno type="DOI">10.1002/stco.201210031</idno>
<idno type="ArticleID">STCO201210031</idno>
</biblStruct>
</sourceDesc>
</fileDesc>
<profileDesc>
<creation>
<date>2012</date>
</creation>
<langUsage>
<language ident="en">en</language>
</langUsage>
<abstract xml:lang="de">
<p>Based on findings from Büchenauer Bridge (1956), the North Elbe Bridge in Hamburg (1963) and the bridge over the Rhine at Leverkusen (1965), Homberg designed and engineered the Friedrich Ebert Bridge across the River Rhine. This was the first bridge in the world with cables that distribute instead of concentrate the load transfer, and thus define the bridge deck as a continuous, elastically supported element and not as a beam on point supports. After the building of major bridges declined in Germany, Homberg became active in France, and later rounded off his work with multi‐cable‐stayed bridges in the UK. That work resulted in the Queen Elizabeth II Bridge (1991), Homberg’s late magnum opus. This article contains a complete catalogue of Homberg’s multi‐cable‐stayed bridges and discusses for the first time previously unpublished designs by Homberg. These prove that he had already moved on from the classic cable‐stayed bridge to the general multi‐span cable‐stayed bridge as early as 1963.</p>
</abstract>
<textClass xml:lang="en">
<keywords scheme="keyword">
<list>
<head>keywords</head>
<item>
<term>infrastructure</term>
</item>
<item>
<term>cable‐stayed bridge</term>
</item>
<item>
<term>structural analysis</term>
</item>
<item>
<term>structural design</term>
</item>
<item>
<term>elements of support</term>
</item>
<item>
<term>biography</term>
</item>
</list>
</keywords>
</textClass>
<textClass>
<keywords scheme="Journal Subject">
<list>
<head>article-category</head>
<item>
<term>Report</term>
</item>
</list>
</keywords>
</textClass>
</profileDesc>
<revisionDesc>
<change when="2012-11">Published</change>
</revisionDesc>
</teiHeader>
</istex:fulltextTEI>
<json:item>
<original>false</original>
<mimetype>text/plain</mimetype>
<extension>txt</extension>
<uri>https://api.istex.fr/document/68C8C2751B6114C19E46E8F29B53A07A09A23608/fulltext/txt</uri>
</json:item>
</fulltext>
<metadata>
<istex:metadataXml wicri:clean="Wiley, elements deleted: body">
<istex:xmlDeclaration>version="1.0" encoding="UTF-8" standalone="yes"</istex:xmlDeclaration>
<istex:document>
<component version="2.0" type="serialArticle" xml:lang="en">
<header>
<publicationMeta level="product">
<publisherInfo>
<publisherName>WILEY‐VCH Verlag</publisherName>
<publisherLoc>Berlin</publisherLoc>
</publisherInfo>
<doi registered="yes">10.1002/(ISSN)1867-0539</doi>
<issn type="print">1867-0520</issn>
<issn type="electronic">1867-0539</issn>
<idGroup>
<id type="product" value="STCO"></id>
</idGroup>
<titleGroup>
<title type="main" xml:lang="en" sort="STEEL CONSTRUCTION">Steel Construction</title>
<title type="short">Steel Construction</title>
</titleGroup>
</publicationMeta>
<publicationMeta level="part" position="40">
<doi origin="wiley" registered="yes">10.1002/stco.v5.4</doi>
<numberingGroup>
<numbering type="journalVolume" number="5">5</numbering>
<numbering type="journalIssue">4</numbering>
</numberingGroup>
<coverDate startDate="2012-11">November 2012</coverDate>
</publicationMeta>
<publicationMeta level="unit" type="article" position="12" status="forIssue">
<doi origin="wiley" registered="yes">10.1002/stco.201210031</doi>
<idGroup>
<id type="unit" value="STCO201210031"></id>
</idGroup>
<countGroup>
<count type="pageTotal" number="15"></count>
</countGroup>
<titleGroup>
<title type="articleCategory">Report</title>
<title type="tocHeading1">Reports</title>
</titleGroup>
<copyright ownership="publisher">Copyright © 2012 Ernst & Sohn Verlag für Architektur und technische Wissenschaften GmbH & Co. KG, Berlin</copyright>
<eventGroup>
<event type="xmlConverted" agent="Converter:JWSART34_TO_WML3G version:3.1.9 mode:FullText" date="2012-11-09"></event>
<event type="firstOnline" date="2012-11-09"></event>
<event type="publishedOnlineFinalForm" date="2012-11-09"></event>
<event type="xmlConverted" agent="Converter:WILEY_ML3G_TO_WILEY_ML3GV2 version:3.8.8" date="2014-02-08"></event>
<event type="xmlConverted" agent="Converter:WML3G_To_WML3G version:4.3.4 mode:FullText" date="2015-02-24"></event>
</eventGroup>
<numberingGroup>
<numbering type="pageFirst">251</numbering>
<numbering type="pageLast">265</numbering>
</numberingGroup>
<linkGroup>
<link type="toTypesetVersion" href="file:STCO.STCO201210031.pdf"></link>
</linkGroup>
</publicationMeta>
<contentMeta>
<countGroup>
<count type="figureTotal" number="14"></count>
<count type="tableTotal" number="0"></count>
<count type="referenceTotal" number="42"></count>
</countGroup>
<titleGroup>
<title type="main" xml:lang="en">The art of major bridge‐building – Hellmut Homberg and his contribution to multiple cable‐stayed spans</title>
<title type="short" xml:lang="en">The art of major bridge‐building – Hellmut Homberg and his contribution to multiple cable‐stayed spans</title>
</titleGroup>
<creators>
<creator xml:id="au1" creatorRole="author" affiliationRef="#a1">
<personName>
<givenNames>Eberhard</givenNames>
<familyName>Pelke </familyName>
<degrees>Dipl.‐Ing.</degrees>
</personName>
<jobTitle>Head of the Bridge Engineering Department</jobTitle>
</creator>
<creator xml:id="au2" creatorRole="author" affiliationRef="#a2">
<personName>
<honorifics>Dr.‐Ing.</honorifics>
<givenNames>Karl‐Eugen</givenNames>
<familyName>Kurrer</familyName>
</personName>
<jobTitle>Editor‐in‐Chief of “Stahlbau”</jobTitle>
</creator>
</creators>
<affiliationGroup>
<affiliation xml:id="a1" countryCode="DE" type="organization">
<unparsedAffiliation>Hessen Mobil, Roads</unparsedAffiliation>
</affiliation>
<affiliation xml:id="a2" countryCode="DE" type="organization">
<unparsedAffiliation>Ernst & Sohn, Berlin, Germany</unparsedAffiliation>
</affiliation>
</affiliationGroup>
<keywordGroup xml:lang="en" type="author">
<keyword xml:id="kwd1">infrastructure</keyword>
<keyword xml:id="kwd2">cable‐stayed bridge</keyword>
<keyword xml:id="kwd3">structural analysis</keyword>
<keyword xml:id="kwd4">structural design</keyword>
<keyword xml:id="kwd5">elements of support</keyword>
<keyword xml:id="kwd6">biography</keyword>
</keywordGroup>
<abstractGroup>
<abstract type="main" xml:lang="de">
<title type="main">Abstract</title>
<p>Based on findings from Büchenauer Bridge (1956), the North Elbe Bridge in Hamburg (1963) and the bridge over the Rhine at Leverkusen (1965), Homberg designed and engineered the Friedrich Ebert Bridge across the River Rhine. This was the first bridge in the world with cables that distribute instead of concentrate the load transfer, and thus define the bridge deck as a continuous, elastically supported element and not as a beam on point supports.</p>
<p>After the building of major bridges declined in Germany, Homberg became active in France, and later rounded off his work with multi‐cable‐stayed bridges in the UK. That work resulted in the Queen Elizabeth II Bridge (1991), Homberg’s late magnum opus.</p>
<p>This article contains a complete catalogue of Homberg’s multi‐cable‐stayed bridges and discusses for the first time previously unpublished designs by Homberg. These prove that he had already moved on from the classic cable‐stayed bridge to the general multi‐span cable‐stayed bridge as early as 1963.</p>
</abstract>
</abstractGroup>
</contentMeta>
</header>
</component>
</istex:document>
</istex:metadataXml>
<mods version="3.6">
<titleInfo lang="en">
<title>The art of major bridge‐building – Hellmut Homberg and his contribution to multiple cable‐stayed spans</title>
</titleInfo>
<titleInfo type="abbreviated" lang="en">
<title>The art of major bridge‐building – Hellmut Homberg and his contribution to multiple cable‐stayed spans</title>
</titleInfo>
<titleInfo type="alternative" contentType="CDATA" lang="en">
<title>The art of major bridge‐building – Hellmut Homberg and his contribution to multiple cable‐stayed spans</title>
</titleInfo>
<name type="personal">
<namePart type="given">Eberhard</namePart>
<namePart type="family">Pelke</namePart>
<namePart type="termsOfAddress">Dipl.‐Ing.</namePart>
<affiliation>Hessen Mobil, Roads</affiliation>
<role>
<roleTerm type="text">author</roleTerm>
</role>
<description>Head of the Bridge Engineering Department</description>
</name>
<name type="personal">
<namePart type="termsOfAddress">Dr.‐Ing.</namePart>
<namePart type="family">Kurrer</namePart>
<affiliation>Ernst & Sohn, Berlin, Germany</affiliation>
<role>
<roleTerm type="text">author</roleTerm>
</role>
<description>Editor‐in‐Chief of “Stahlbau”</description>
</name>
<typeOfResource>text</typeOfResource>
<genre type="article" displayLabel="article"></genre>
<originInfo>
<publisher>WILEY‐VCH Verlag</publisher>
<place>
<placeTerm type="text">Berlin</placeTerm>
</place>
<dateIssued encoding="w3cdtf">2012-11</dateIssued>
<copyrightDate encoding="w3cdtf">2012</copyrightDate>
</originInfo>
<language>
<languageTerm type="code" authority="rfc3066">en</languageTerm>
<languageTerm type="code" authority="iso639-2b">eng</languageTerm>
</language>
<physicalDescription>
<internetMediaType>text/html</internetMediaType>
<extent unit="figures">14</extent>
<extent unit="references">42</extent>
</physicalDescription>
<abstract lang="de">Based on findings from Büchenauer Bridge (1956), the North Elbe Bridge in Hamburg (1963) and the bridge over the Rhine at Leverkusen (1965), Homberg designed and engineered the Friedrich Ebert Bridge across the River Rhine. This was the first bridge in the world with cables that distribute instead of concentrate the load transfer, and thus define the bridge deck as a continuous, elastically supported element and not as a beam on point supports. After the building of major bridges declined in Germany, Homberg became active in France, and later rounded off his work with multi‐cable‐stayed bridges in the UK. That work resulted in the Queen Elizabeth II Bridge (1991), Homberg’s late magnum opus. This article contains a complete catalogue of Homberg’s multi‐cable‐stayed bridges and discusses for the first time previously unpublished designs by Homberg. These prove that he had already moved on from the classic cable‐stayed bridge to the general multi‐span cable‐stayed bridge as early as 1963.</abstract>
<subject lang="en">
<genre>keywords</genre>
<topic>infrastructure</topic>
<topic>cable‐stayed bridge</topic>
<topic>structural analysis</topic>
<topic>structural design</topic>
<topic>elements of support</topic>
<topic>biography</topic>
</subject>
<relatedItem type="host">
<titleInfo>
<title>Steel Construction</title>
</titleInfo>
<titleInfo type="abbreviated">
<title>Steel Construction</title>
</titleInfo>
<genre type="journal">journal</genre>
<subject>
<genre>article-category</genre>
<topic>Report</topic>
</subject>
<identifier type="ISSN">1867-0520</identifier>
<identifier type="eISSN">1867-0539</identifier>
<identifier type="DOI">10.1002/(ISSN)1867-0539</identifier>
<identifier type="PublisherID">STCO</identifier>
<part>
<date>2012</date>
<detail type="volume">
<caption>vol.</caption>
<number>5</number>
</detail>
<detail type="issue">
<caption>no.</caption>
<number>4</number>
</detail>
<extent unit="pages">
<start>251</start>
<end>265</end>
<total>15</total>
</extent>
</part>
</relatedItem>
<identifier type="istex">68C8C2751B6114C19E46E8F29B53A07A09A23608</identifier>
<identifier type="DOI">10.1002/stco.201210031</identifier>
<identifier type="ArticleID">STCO201210031</identifier>
<accessCondition type="use and reproduction" contentType="copyright">Copyright © 2012 Ernst & Sohn Verlag für Architektur und technische Wissenschaften GmbH & Co. KG, Berlin</accessCondition>
<recordInfo>
<recordContentSource>WILEY</recordContentSource>
<recordOrigin>WILEY‐VCH Verlag</recordOrigin>
</recordInfo>
</mods>
</metadata>
<serie></serie>
</istex>
</record>

Pour manipuler ce document sous Unix (Dilib)

EXPLOR_STEP=$WICRI_ROOT/Wicri/France/explor/LeHavreV1/Data/Istex/Corpus
HfdSelect -h $EXPLOR_STEP/biblio.hfd -nk 001407 | SxmlIndent | more

Ou

HfdSelect -h $EXPLOR_AREA/Data/Istex/Corpus/biblio.hfd -nk 001407 | SxmlIndent | more

Pour mettre un lien sur cette page dans le réseau Wicri

{{Explor lien
   |wiki=    Wicri/France
   |area=    LeHavreV1
   |flux=    Istex
   |étape=   Corpus
   |type=    RBID
   |clé=     ISTEX:68C8C2751B6114C19E46E8F29B53A07A09A23608
   |texte=   The art of major bridge‐building – Hellmut Homberg and his contribution to multiple cable‐stayed spans
}}

Wicri

This area was generated with Dilib version V0.6.25.
Data generation: Sat Dec 3 14:37:02 2016. Site generation: Tue Mar 5 08:25:07 2024