A normative structure for the European electricity market
Identifieur interne : 001D70 ( Main/Exploration ); précédent : 001D69; suivant : 001D71A normative structure for the European electricity market
Auteurs : A. Verbruggen [Belgique]Source :
- Energy policy [ 0301-4215 ] ; 1997.
Descripteurs français
- Pascal (Inist)
- Wicri :
- topic : Industrie électrique, Marché.
English descriptors
- KwdEn :
Abstract
A normative structure for the European electricity industry is discussed. This model builds upon proposals and experiences in several European nations (in particular the Netherlands and the UK). Two rivalling structures (vertical integration versus open competition) are compared. Our 'open structure' is specific in not allowing TPA (third party access) to the grid, and in making the necessary distinction among 'independent generators' and Independent Generators of Own Power IGOPS. Cost economies (scale, scope and density) are related to the three major functions of a power system (generation, transport, distribution). The performance of the rival models is assessed for five criteria: sustainability, economic efficiency, regulatory efficiency, equity, and institutional feasibility.
Affiliations:
Links toward previous steps (curation, corpus...)
- to stream PascalFrancis, to step Corpus: 000176
- to stream PascalFrancis, to step Curation: 000158
- to stream PascalFrancis, to step Checkpoint: 000159
- to stream Main, to step Merge: 001D84
- to stream Main, to step Curation: 001D70
Le document en format XML
<record><TEI><teiHeader><fileDesc><titleStmt><title xml:lang="en" level="a">A normative structure for the European electricity market</title>
<author><name sortKey="Verbruggen, A" sort="Verbruggen, A" uniqKey="Verbruggen A" first="A." last="Verbruggen">A. Verbruggen</name>
<affiliation wicri:level="4"><inist:fA14 i1="01"><s1>University of Antwerp, Department for Technology, Energy and Environment (UFSIASTEM), Prinsstraat 13</s1>
<s2>2000 Antwerp</s2>
<s3>BEL</s3>
<sZ>1 aut.</sZ>
</inist:fA14>
<country>Belgique</country>
<placeName><region type="province" nuts="2">Province d'Anvers</region>
<settlement type="city">Anvers</settlement>
</placeName>
<orgName type="university">Université d'Anvers</orgName>
</affiliation>
</author>
</titleStmt>
<publicationStmt><idno type="wicri:source">INIST</idno>
<idno type="inist">97-0503856</idno>
<date when="1997">1997</date>
<idno type="stanalyst">PASCAL 97-0503856 INIST</idno>
<idno type="RBID">Pascal:97-0503856</idno>
<idno type="wicri:Area/PascalFrancis/Corpus">000176</idno>
<idno type="wicri:Area/PascalFrancis/Curation">000158</idno>
<idno type="wicri:Area/PascalFrancis/Checkpoint">000159</idno>
<idno type="wicri:doubleKey">0301-4215:1997:Verbruggen A:a:normative:structure</idno>
<idno type="wicri:Area/Main/Merge">001D84</idno>
<idno type="wicri:Area/Main/Curation">001D70</idno>
<idno type="wicri:Area/Main/Exploration">001D70</idno>
</publicationStmt>
<sourceDesc><biblStruct><analytic><title xml:lang="en" level="a">A normative structure for the European electricity market</title>
<author><name sortKey="Verbruggen, A" sort="Verbruggen, A" uniqKey="Verbruggen A" first="A." last="Verbruggen">A. Verbruggen</name>
<affiliation wicri:level="4"><inist:fA14 i1="01"><s1>University of Antwerp, Department for Technology, Energy and Environment (UFSIASTEM), Prinsstraat 13</s1>
<s2>2000 Antwerp</s2>
<s3>BEL</s3>
<sZ>1 aut.</sZ>
</inist:fA14>
<country>Belgique</country>
<placeName><region type="province" nuts="2">Province d'Anvers</region>
<settlement type="city">Anvers</settlement>
</placeName>
<orgName type="university">Université d'Anvers</orgName>
</affiliation>
</author>
</analytic>
<series><title level="j" type="main">Energy policy</title>
<title level="j" type="abbreviated">Energy policy</title>
<idno type="ISSN">0301-4215</idno>
<imprint><date when="1997">1997</date>
</imprint>
</series>
</biblStruct>
</sourceDesc>
<seriesStmt><title level="j" type="main">Energy policy</title>
<title level="j" type="abbreviated">Energy policy</title>
<idno type="ISSN">0301-4215</idno>
</seriesStmt>
</fileDesc>
<profileDesc><textClass><keywords scheme="KwdEn" xml:lang="en"><term>Comparative study</term>
<term>Electric industry</term>
<term>Industrial organization</term>
<term>Integrated system</term>
<term>Markets</term>
<term>Modeling</term>
<term>Open systems</term>
<term>Technicoeconomic study</term>
<term>Western Europe</term>
</keywords>
<keywords scheme="Pascal" xml:lang="fr"><term>Industrie électrique</term>
<term>Organisation industrielle</term>
<term>Système intégré</term>
<term>Système ouvert</term>
<term>Etude technicoéconomique</term>
<term>Modélisation</term>
<term>Etude comparative</term>
<term>Marché</term>
<term>Europe Ouest</term>
</keywords>
<keywords scheme="Wicri" type="topic" xml:lang="fr"><term>Industrie électrique</term>
<term>Marché</term>
</keywords>
</textClass>
</profileDesc>
</teiHeader>
<front><div type="abstract" xml:lang="en">A normative structure for the European electricity industry is discussed. This model builds upon proposals and experiences in several European nations (in particular the Netherlands and the UK). Two rivalling structures (vertical integration versus open competition) are compared. Our 'open structure' is specific in not allowing TPA (third party access) to the grid, and in making the necessary distinction among 'independent generators' and Independent Generators of Own Power IGOPS. Cost economies (scale, scope and density) are related to the three major functions of a power system (generation, transport, distribution). The performance of the rival models is assessed for five criteria: sustainability, economic efficiency, regulatory efficiency, equity, and institutional feasibility.</div>
</front>
</TEI>
<affiliations><list><country><li>Belgique</li>
</country>
<region><li>Province d'Anvers</li>
</region>
<settlement><li>Anvers</li>
</settlement>
<orgName><li>Université d'Anvers</li>
</orgName>
</list>
<tree><country name="Belgique"><region name="Province d'Anvers"><name sortKey="Verbruggen, A" sort="Verbruggen, A" uniqKey="Verbruggen A" first="A." last="Verbruggen">A. Verbruggen</name>
</region>
</country>
</tree>
</affiliations>
</record>
Pour manipuler ce document sous Unix (Dilib)
EXPLOR_STEP=$WICRI_ROOT/Wicri/Belgique/explor/OpenAccessBelV2/Data/Main/Exploration
HfdSelect -h $EXPLOR_STEP/biblio.hfd -nk 001D70 | SxmlIndent | more
Ou
HfdSelect -h $EXPLOR_AREA/Data/Main/Exploration/biblio.hfd -nk 001D70 | SxmlIndent | more
Pour mettre un lien sur cette page dans le réseau Wicri
{{Explor lien |wiki= Wicri/Belgique |area= OpenAccessBelV2 |flux= Main |étape= Exploration |type= RBID |clé= Pascal:97-0503856 |texte= A normative structure for the European electricity market }}
This area was generated with Dilib version V0.6.25. |